diff options
author | Georg Kunz <georg.kunz@ericsson.com> | 2017-12-22 14:48:10 +0100 |
---|---|---|
committer | Georg Kunz <georg.kunz@ericsson.com> | 2018-01-15 13:20:59 +0100 |
commit | 8f16dae9dae6d13bc6f5934bae5d26d420efd892 (patch) | |
tree | f9b1b5024e2cc337beb895cf9fbaf59ef37a13b1 /docs/testing/user/testspecification/index.rst | |
parent | ee725220d42120028b7561c5b6c268d2bd350e88 (diff) |
Changing CVP to OVP in the documentation
Due to the name change from 'CVP' to 'OVP', the documentation has to be
updated.
Change-Id: Id934e8fc07f60802f7aa6b3d295d268c4c9b71f8
Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>
Diffstat (limited to 'docs/testing/user/testspecification/index.rst')
-rw-r--r-- | docs/testing/user/testspecification/index.rst | 10 |
1 files changed, 5 insertions, 5 deletions
diff --git a/docs/testing/user/testspecification/index.rst b/docs/testing/user/testspecification/index.rst index 858d02ce..2a8298c9 100644 --- a/docs/testing/user/testspecification/index.rst +++ b/docs/testing/user/testspecification/index.rst @@ -5,23 +5,23 @@ .. _dovetail-test_case_specification: ================================================== -Compliance Verification program test specification +OPNFV Verified Program test specification ================================================== Introduction ============ -The OPNFV CVP provides a series or test areas aimed to evaluate the operation +The OPNFV OVP provides a series or test areas aimed to evaluate the operation of an NFV system in accordance with carrier networking needs. Each test area contains a number of associated test cases which are described in detail in the associated test specification. -All tests in the CVP are required to fulfill a specific set of criteria in -order that the CVP is able to provide a fair assessment of the system under +All tests in the OVP are required to fulfill a specific set of criteria in +order that the OVP is able to provide a fair assessment of the system under test. Test requirements are described in the 'Test Case Requirements'_ document. -All tests areas addressed in the CVP are covered in the following test +All tests areas addressed in the OVP are covered in the following test specification documents. .. toctree:: |