summaryrefslogtreecommitdiffstats
path: root/docs/testing/user/systempreparation
diff options
context:
space:
mode:
authorChristopher Price <christopher.price@ericsson.com>2017-04-26 09:59:05 +0000
committerGerrit Code Review <gerrit@opnfv.org>2017-04-26 09:59:05 +0000
commit2fbc0733dbcebb9d3155775e7001977f909ffd50 (patch)
treef036439290641f0fcd0be9ac142660e79ae979fc /docs/testing/user/systempreparation
parent4ee4bfd19fd2d9e8328e9594c6eb3a00ec67878d (diff)
parent48489a3e205014420bdb7d604e99b07e4fd8736b (diff)
Merge "JIRA: DOVETAIL-352 Updating the test specification document with iterative inprovements."
Diffstat (limited to 'docs/testing/user/systempreparation')
-rw-r--r--docs/testing/user/systempreparation/index.rst72
1 files changed, 72 insertions, 0 deletions
diff --git a/docs/testing/user/systempreparation/index.rst b/docs/testing/user/systempreparation/index.rst
new file mode 100644
index 00000000..3364becb
--- /dev/null
+++ b/docs/testing/user/systempreparation/index.rst
@@ -0,0 +1,72 @@
+.. This work is licensed under a Creative Commons Attribution 4.0 International License.
+.. http://creativecommons.org/licenses/by/4.0
+.. (c) Ericsson AB
+
+============================================================
+Compliance and Verification program system preparation guide
+============================================================
+
+.. toctree::
+ :maxdepth: 2
+
+Version history
+===============
+
++------------+----------+------------------+----------------------------------+
+| **Date** | **Ver.** | **Author** | **Comment** |
+| | | | |
++------------+----------+------------------+----------------------------------+
+| 2017-04-25 | 0.0.1 | Chris Price | Draft version |
+| | | | |
++------------+----------+------------------+----------------------------------+
+
+
+Introduction
+============
+
+This system preparation guide provides a detailed outline of the needed system prerequisites
+and expectations for running OPNFV evaluation testing.
+
+Test planning and preparation
+=============================
+
+https://jira.opnfv.org/browse/DOVETAIL-384
+
+Give an outline of the planning phase.
+
+--------------
+Pre-requisites
+--------------
+
+Describe what needs to be in place before starting.
+
+Required Infrastructure, connectivity needs, LF & CVP accounts and any additional security or peripheral needs.
+Use sub-chapters for instance for any accounts etc that need to be created.
+
+-------------------------------------------
+Preparing the virtualisation infrastructure
+-------------------------------------------
+
+Briefly state what will be tested as an intro, then outline the required system state to be achieved prior to running the tests.
+
+Preparing the test staging host system
+--------------------------------------
+
+https://jira.opnfv.org/browse/DOVETAIL-385
+
+What is required from the system running the CVP test suites?
+
+Required network configuration
+-------------------------------
+
+https://jira.opnfv.org/browse/DOVETAIL-386
+
+VLAN configurations required for NFV deployments. Non-VLAN configurations if needed.
+
+Preparing your system for CVP testing
+-------------------------------------
+
+https://jira.opnfv.org/browse/DOVETAIL-387
+
+Describe how to realise the "Pharos ready state" and the "Software ready state" in this section.
+