From 48489a3e205014420bdb7d604e99b07e4fd8736b Mon Sep 17 00:00:00 2001 From: ChristopherPrice Date: Thu, 30 Mar 2017 15:11:28 +0200 Subject: JIRA: DOVETAIL-352 Updating the test specification document with iterative inprovements. JIRA tasks are being created for specific sections of the document. Refer to the doc for links to relevant JIRA tasks. Change-Id: I1717d56b8817c38802a227db320f30029f68fbd0 Signed-off-by: ChristopherPrice --- docs/testing/user/systempreparation/index.rst | 72 +++++++++++++++++++++++++++ 1 file changed, 72 insertions(+) create mode 100644 docs/testing/user/systempreparation/index.rst (limited to 'docs/testing/user/systempreparation') diff --git a/docs/testing/user/systempreparation/index.rst b/docs/testing/user/systempreparation/index.rst new file mode 100644 index 00000000..3364becb --- /dev/null +++ b/docs/testing/user/systempreparation/index.rst @@ -0,0 +1,72 @@ +.. This work is licensed under a Creative Commons Attribution 4.0 International License. +.. http://creativecommons.org/licenses/by/4.0 +.. (c) Ericsson AB + +============================================================ +Compliance and Verification program system preparation guide +============================================================ + +.. toctree:: + :maxdepth: 2 + +Version history +=============== + ++------------+----------+------------------+----------------------------------+ +| **Date** | **Ver.** | **Author** | **Comment** | +| | | | | ++------------+----------+------------------+----------------------------------+ +| 2017-04-25 | 0.0.1 | Chris Price | Draft version | +| | | | | ++------------+----------+------------------+----------------------------------+ + + +Introduction +============ + +This system preparation guide provides a detailed outline of the needed system prerequisites +and expectations for running OPNFV evaluation testing. + +Test planning and preparation +============================= + +https://jira.opnfv.org/browse/DOVETAIL-384 + +Give an outline of the planning phase. + +-------------- +Pre-requisites +-------------- + +Describe what needs to be in place before starting. + +Required Infrastructure, connectivity needs, LF & CVP accounts and any additional security or peripheral needs. +Use sub-chapters for instance for any accounts etc that need to be created. + +------------------------------------------- +Preparing the virtualisation infrastructure +------------------------------------------- + +Briefly state what will be tested as an intro, then outline the required system state to be achieved prior to running the tests. + +Preparing the test staging host system +-------------------------------------- + +https://jira.opnfv.org/browse/DOVETAIL-385 + +What is required from the system running the CVP test suites? + +Required network configuration +------------------------------- + +https://jira.opnfv.org/browse/DOVETAIL-386 + +VLAN configurations required for NFV deployments. Non-VLAN configurations if needed. + +Preparing your system for CVP testing +------------------------------------- + +https://jira.opnfv.org/browse/DOVETAIL-387 + +Describe how to realise the "Pharos ready state" and the "Software ready state" in this section. + -- cgit 1.2.3-korg