summaryrefslogtreecommitdiffstats
path: root/jjb/global/slave-params.yml
diff options
context:
space:
mode:
authorTim Rozet <trozet@redhat.com>2018-02-07 16:33:50 -0500
committerTim Rozet <trozet@redhat.com>2018-02-07 16:33:50 -0500
commit0fd7d86a413c33e80959fe36a41387ad1408d29b (patch)
tree675bad22ee662dcd1271c7b2ee8f60afbdcf3a68 /jjb/global/slave-params.yml
parent0b4524bfcd0e406687e2053cf7ef9913b606f635 (diff)
Apex: Fixes scheduling with apex verify
apex-verify job calls apex-virtual to deploy and run functest. Apex has 2 virtual slaves attached to the apex-virtual-master label. When 2 verify jobs are triggered at the same time, apex-verify job is scheduled on each slave correctly. However, when the mulitjob triggers apex-virtual jobs, it only schedules both of them to a single slave. This happens even though apex-virtual job has the same slave label and node parameters are not passed from verify job. This patch changes the node to be passed to apex-virtual from apex-verify. That way 2 nodes will be scheduled on, but this is still not ideal scheduling as more than 1 verify can run per node (but not more than one virtual job). Change-Id: I155351c9037f70df2c5dba11bb5592423849e760 Signed-off-by: Tim Rozet <trozet@redhat.com>
Diffstat (limited to 'jjb/global/slave-params.yml')
0 files changed, 0 insertions, 0 deletions