1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
|
General Requirements Background and Terminology
-----------------------------------------------
Terminologies and definitions
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
NFVI
The term is an abbreviation for Network Function Virtualization
Infrastructure; sometimes it is also referred as data plane in this
document.
VIM
The term is an abbreviation for Virtual Infrastructure Management;
sometimes it is also referred as control plane in this document.
Operator
The term refers to network service providers and Virtual Network
Function (VNF) providers.
End-User
The term refers to a subscriber of the Operator's services.
Network Service
The term refers to a service provided by an Operator to its
End-users using a set of (virtualized) Network Functions
Infrastructure Services
The term refers to services provided by the NFV Infrastructure and the
the Management & Orchestration functions to the VNFs. I.e.
these are the virtual resources as perceived by the VNFs.
Smooth Upgrade
The term refers to an upgrade that results in no service outage
for the end-users.
Rolling Upgrade
The term refers to an upgrade strategy that upgrades each node or
a subset of nodes in a wave style rolling through the data centre. It
is a popular upgrade strategy to maintain service availability.
Parallel Universe Upgrade
The term refers to an upgrade strategy that creates and deploys
a new universe - a system with the new configuration - while the old
system continues running. The state of the old system is transferred
to the new system after sufficient testing of the new system.
Infrastructure Resource Model
The term refers to the representation of infrastructure resources,
namely: the physical resources, the virtualization
facility resources and the virtual resources.
Physical Resource
The term refers to a hardware pieces of the NFV infrastructure, which may
also include the firmware which enables the hardware.
Virtual Resource
The term refers to a resource, which is provided as services built on top
of the physical resources via the virtualization facilities; in particular,
they are the resources on which VNF entities are deployed, e.g.
the VMs, virtual switches, virtual routers, virtual disks etc.
Visualization Facility
The term refers to a resource that enables the creation
of virtual environments on top of the physical resources, e.g.
hypervisor, OpenStack, etc.
Upgrade Campaign
The term refers to a choreography that describes how the upgrade should
be performed in terms of its targets (i.e. upgrade objects), the
steps/actions required of upgrading each, and the coordination of these
steps so that service availability can be maintained. It is an input to an
upgrade tool (Escalator) to carry out the upgrade.
Upgrade Duration
The duration of an upgrade characterized by the time elapsed between its
initiation and its completion. E.g. from the moment the execution of an
upgrade campaign has started until it has been committed. Depending on
the upgrade method and its target some parts of the system may be in a more
vulnerable state.
Outage
The period of time during which a given service is not provided is referred
as the outage of that given service. If a subsystem or the entire system
does not provide any service, it is the outage of the given subsystem or the
system. Smooth upgrade means upgrade with no outage for the user plane, i.e.
no VNF should experience service outage.
Rollback
The term refers to a failure handling strategy that reverts the changes
done by a potentially failed upgrade execution one by one in a reverse order.
I.e. it is like undoing the changes done by the upgrade.
Restore
The term refers to a failure handling strategy that reverts the changes
done by an upgrade by restoring the system from some backup data. This
results in the loss of any data persisted since the backup has been taken.
Rollforward
The term refers to a failure handling strategy applied after a restore
(from a backup) opertaion to recover any loss of data persisted between
the time the backup has been taken and the moment it is restored. Rollforward
requires that data that needs to survive the restore operation is logged at
a location not impacted by the restore so that it can be re-applied to the
system after its restoration from the backup.
Downgrade
The term refers to an upgrade in which an earlier version of the software
is restored through the upgrade procedure. A system can be downgraded to any
earlier version and the compatibility of the versions will determine the
applicable upgrade strategies and whether service outage can be avoided.
In particular any data conversion needs special attention.
Upgrade Objects
~~~~~~~~~~~~~~~
Physical Resource
^^^^^^^^^^^^^^^^^
Most cloud infrastructures support the dynamic addition/removal of
hardware. Accordingly a hardware upgrade could be done by adding the new
piece of hardware and removing the old one. From the persepctive of smooth
upgrade the orchestration/scheduling of this actions is the primary concern.
Upgrading a physical resource may involve as well the upgrade of its firmware
and/or modifying its configuration data. This may require the restart of the
hardware.
Virtual Resources
^^^^^^^^^^^^^^^^^
Addition and removal of virtual resources may be initiated by the users or be
a result of an elasticity action. Users may also request the upgrade of their
virtual resources using a new VM image.
.. Needs to be moved to requirement section: Escalator should facilitate such an
option and allow for a smooth upgrade.
On the other hand changes in the infrastructure, namely, in the hardware and/or
the virtualization facility resources may result in the upgrade of the virtual
resources. For example if by some reason the hypervisor is changed and
the current VMs cannot be migrated to the new hypervisor - they are
incompatible - then the VMs need to be upgraded too. This is not
something the NFVI user (i.e. VNFs ) would know about. In such cases
smooth upgrade is essential.
Virtualization Facility Resources
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
Based on the functionality they provide, virtualization facility
resources could be divided into computing node, networking node,
storage node and management node.
The possible upgrade objects in these nodes are addressed below:
(Note: hardware based virtualization may be considered as virtualization
facility resource, but from escalator perspective, it is better to
consider it as part of the hardware upgrade. )
**Computing node**
1. OS Kernel
2. Hypvervisor and virtual switch
3. Other kernel modules, like driver
4. User space software packages, like nova-compute agents and other
control plane programs.
Updating 1 and 2 will cause the loss of virtualzation functionality of
the compute node, which may lead to data plane services interruption
if the virtual resource is not redudant.
Updating 3 might result the same.
Updating 4 might lead to control plane services interruption if not an
HA deployment.
**Networking node**
1. OS kernel, optional, not all switches/routers allow the upgrade their
OS since it is more like a firmware than a generic OS.
2. User space software package, like neutron agents and other control
plane programs
Updating 1 if allowed will cause a node reboot and therefore leads to
data plane service interruption if the virtual resource is not
redundant.
Updating 2 might lead to control plane services interruption if not an
HA deployment.
**Storage node**
1. OS kernel, optional, not all storage nodes allow the upgrade their OS
since it is more like a firmware than a generic OS.
2. Kernel modules
3. User space software packages, control plane programs
Updating 1 if allowed will cause a node reboot and therefore leads to
data plane services interruption if the virtual resource is not
redundant.
Update 2 might result in the same.
Updating 3 might lead to control plane services interruption if not an
HA deployment.
**Management node**
1. OS Kernel
2. Kernel modules, like driver
3. User space software packages, like database, message queue and
control plane programs.
Updating 1 will cause a node reboot and therefore leads to control
plane services interruption if not an HA deployment. Updating 2 might
result in the same.
Updating 3 might lead to control plane services interruption if not an
HA deployment.
Upgrade Granularity
~~~~~~~~~~~~~~~~~~~
The granularity of an upgrade can be characterized from two perspective:
- the physical dimension and
- the software dimension
Physical Dimension
^^^^^^^^^^^^^^^^^^
The physical dimension characterizes the number of similar upgrade objects
targeted by the upgrade, i.e. whether it is full / partial upgrade of a
data centre, cluster, zone.
Because of the upgrade of a data centre or a zone, it may be divided into
several batches. Thus there is a need for efficiency in the execution of
upgrades of potentially huge number of upgrade objects while still maintain
availability to fulfill the requirement of smooth upgrade.
The upgrade of a cloud environment (cluster) may also
be partial. For example, in one cloud environment running a number of
VNFs, we may just try to upgrade one of them to check the stability and
performance, before we upgrade all of them.
Thus there is a need for proper organization of the artifacts associated with
the different upgrade objects. Also the different versions should be able
to coextist beyond the upgrade period.
From this perspective special attention may be needed when upgrading
objects that are collaborating in a redundancy schema as in this case
different versions not only need to coexist but also collaborate. This
puts requirement on the upgrade objects primarily. If this is not possible
the upgrade campaign should be designed in such a way that the proper
isolation is ensured.
Software Dimension
^^^^^^^^^^^^^^^^^^
The software dimension of the upgrade characterizes the upgrade object
type targeted and the combination in which they are upgraded together.
Even though the upgrade may
initially target only one type of upgrade object, e.g. the hypervisor
the dependency of other upgrade objects on this initial target object may
require their upgrade as well. I.e. the upgrades need to be combined. From this
perspective the main concern is compatibility of the dependent and
sponsor objects. To take into consideration of these dependencies
they need to be described together with the version compatility information.
Breaking dependencies is the major cause of outages during upgrades.
In other cases it is more efficient to upgrade a combination of upgrade
objects than to do it one by one. One aspect of the combination is how
the upgrade packages can be combined, whether a new image can be created for
them before hand or the different packages can be installed during the upgrade
independently, but activated together.
The combination of upgrade objects may span across
layers (e.g. software stack in the host and the VM of the VNF).
Thus, it may require additional coordination between the management layers.
With respect to each upgrade object type and even stacks we can
distingush major and minor upgrades:
**Major Upgrade**
Upgrades between major releases may introducing significant changes in
function, configuration and data, such as the upgrade of OPNFV from
Arno to Brahmaputra.
**Minor Upgrade**
Upgrades inside one major releases which would not leads to changing
the structure of the platform and may not infect the schema of the
system data.
Scope of Impact
~~~~~~~~~~~~~~~
Considering availability and therefore smooth upgrade, one of the major
concerns is the predictability and control of the outcome of the different
upgrade operations. Ideally an upgrade can be performed without impacting any
entity in the system, which means none of the operations change or potentially
change the behaviour of any entity in the system in an uncotrolled manner.
Accordingly the operations of such an upgrade can be performed any time while
the system is running, while all the entities are online. No entity needs to be
taken offline to avoid such adverse effects. Hence such upgrade operations
are referred as online operations. The effects of the upgrade might be activated
next time it is used, or may require a special activation action such as a
restart. Note that the activation action provides more control and predictability.
If an entity's behavior in the system may change due to the upgrade it may
be better to take it offline for the time of the relevant upgrade operations.
The main question is however considering the hosting relation of an upgrade
object what hosted entities are impacted. Accordingly we can identify a scope
which is impacted by taking the given upgrade object offline. The entities
that are in the scope of impact may need to be taken offline or moved out of
this scope i.e. migrated.
If the impacted entity is in a different layer managed by another manager
this may require coordination because taking out of service some
infrastructure resources for the time of their upgrade which support virtual
resources used by VNFs that should not experience outages. The hosted VNFs
may or may not allow for the hot migration of their VMs. In case of migration
the VMs placement policy should be considered.
Upgrade duration
~~~~~~~~~~~~~~~~
As the OPNFV end-users are primarily Telecom operators, the network
services provided by the VNFs deployed on the NFVI should meet the
requirement of 'Carrier Grade'.::
In telecommunication, a "carrier grade" or"carrier class" refers to a
system, or a hardware or software component that is extremely reliable,
well tested and proven in its capabilities. Carrier grade systems are
tested and engineered to meet or exceed "five nines" high availability
standards, and provide very fast fault recovery through redundancy
(normally less than 50 milliseconds). [from wikipedia.org]
"five nines" means working all the time in ONE YEAR except 5'15".
::
We have learnt that a well prepared upgrade of OpenStack needs 10
minutes. The major time slot in the outage time is used spent on
synchronizing the database. [from ' Ten minutes OpenStack Upgrade? Done!
' by Symantec]
This 10 minutes of downtime of the OpenStack services however did not impact the
users, i.e. the VMs running on the compute nodes. This was the outage of
the control plane only. On the other hand with respect to the
preparations this was a manually tailored upgrade specific to the
particular deployment and the versions of each OpenStack service.
The project targets to achieve a more generic methodology, which however
requires that the upgrade objects fulfil certain requirements. Since
this is only possible on the long run we target first the upgrade
of the different VIM services from version to version.
**Questions:**
1. Can we manage to upgrade OPNFV in only 5 minutes?
.. <MT> The first question is whether we have the same carrier grade
requirement on the control plane as on the user plane. I.e. how
much control plane outage we can/willing to tolerate?
In the above case probably if the database is only half of the size
we can do the upgrade in 5 minutes, but is that good? It also means
that if the database is twice as much then the outage is 20
minutes.
For the user plane we should go for less as with two release yearly
that means 10 minutes outage per year.
.. <Malla> 10 minutes outage per year to the users? Plus, if we take
control plane into the consideration, then total outage will be
more than 10 minute in whole network, right?
.. <MT> The control plane outage does not have to cause outage to
the users, but it may of course depending on the size of the system
as it's more likely that there's a failure that needs to be handled
by the control plane.
2. Is it acceptable for end users ? Such as a planed service
interruption will lasting more than ten minutes for software
upgrade.
.. <MT> For user plane, no it's not acceptable in case of
carrier-grade. The 5' 15" downtime should include unplanned and
planned downtimes.
.. <Malla> I go agree with Maria, it is not acceptable.
3. Will any VNFs still working well when VIM is down?
.. <MT> In case of OpenStack it seems yes. .:)
The maximum duration of an upgrade
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
The duration of an upgrade is related to and proportional with the
scale and the complexity of the OPNFV platform as well as the
granularity (in function and in space) of the upgrade.
.. <Malla> Also, if is a partial upgrade like module upgrade, it depends
also on the OPNFV modules and their tight connection entities as well.
.. <MT> Since the maintenance window is shrinking and becoming non-existent
the duration of the upgrade is secondary to the requirement of smooth upgrade.
But probably we want to be able to put a time constraint on each upgrade
during which it must complete otherwise it is considered failed and the system
should be rolled back. I.e. in case of automatic execution it might not be clear
if an upgrade is long or just hanging. The time constraints may be a function
of the size of the system in terms of the upgrade object(s).
The maximum duration of a roll back when an upgrade is failed
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
The duration of a roll back is short than the corresponding upgrade. It
depends on the duration of restore the software and configure data from
pre-upgrade backup / snapshot.
.. <MT> During the upgrade process two types of failure may happen:
In case we can recover from the failure by undoing the upgrade
actions it is possible to roll back the already executed part of the
upgrade in graceful manner introducing no more service outage than
what was introduced during the upgrade. Such a graceful roll back
requires typically the same amount of time as the executed portion of
the upgrade and impose minimal state/data loss.
.. <MT> Requirement: It should be possible to roll back gracefully the
failed upgrade of stateful services of the control plane.
In case we cannot recover from the failure by just undoing the
upgrade actions, we have to restore the upgraded entities from their
backed up state. In other terms the system falls back to an earlier
state, which is typically a faster recovery procedure than graceful
roll back and depending on the statefulness of the entities involved it
may result in significant state/data loss.
.. <MT> Two possible types of failures can happen during an upgrade
.. <MT> We can recover from the failure that occurred in the upgrade process:
In this case, a graceful rolling back of the executed part of the
upgrade may be possible which would "undo" the executed part in a
similar fashion. Thus, such a roll back introduces no more service
outage during an upgrade than the executed part introduced. This
process typically requires the same amount of time as the executed
portion of the upgrade and impose minimal state/data loss.
.. <MT> We cannot recover from the failure that occurred in the upgrade
process: In this case, the system needs to fall back to an earlier
consistent state by reloading this backed-up state. This is typically
a faster recovery procedure than the graceful roll back, but can cause
state/data loss. The state/data loss usually depends on the
statefulness of the entities whose state is restored from the backup.
The maximum duration of a VNF interruption (Service outage)
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
Since not the entire process of a smooth upgrade will affect the VNFs,
the duration of the VNF interruption may be shorter than the duration
of the upgrade. In some cases, the VNF running without the control
from of the VIM is acceptable.
.. <MT> Should require explicitly that the NFVI should be able to
provide its services to the VNFs independent of the control plane?
.. <MT> Requirement: The upgrade of the control plane must not cause
interruption of the NFVI services provided to the VNFs.
.. <MT> With respect to carrier-grade the yearly service outage of the
VNF should not exceed 5' 15" regardless whether it is planned or
unplanned outage. Considering the HA requirements TL-9000 requires an
end-to-end service recovery time of 15 seconds based on which the ETSI
GS NFV-REL 001 V1.1.1 (2015-01) document defines three service
availability levels (SAL). The proposed example service recovery times
for these levels are:
.. <MT> SAL1: 5-6 seconds
.. <MT> SAL2: 10-15 seconds
.. <MT> SAL3: 20-25 seconds
.. <Pva> my comment was actually that the downtime metrics of the
underlying elements, components and services are small fraction of the
total E2E service availability time. No-one on the E2E service path
will get the whole downtime allocation (in this context it includes
upgrade process related outages for the services provided by VIM etc.
elements that are subject to upgrade process).
.. <MT> So what you are saying is that the upgrade of any entity
(component, service) shouldn't cause even this much service
interruption. This was the reason I brought these figures here as well
that they are posing some kind of upper-upper boundary. Ideally the
interruption is in the millisecond range i.e. no more than a
switch-over or a live migration.
.. <MT> Requirement: Any interruption caused to the VNF by the upgrade
of the NFVI should be in the sub-second range.
.. <MT]> In the future we also need to consider the upgrade of the NFVI,
i.e. HW, firmware, hypervisors, host OS etc.
|