summaryrefslogtreecommitdiffstats
path: root/docs/testing/user/systempreparation/index.rst
blob: 3364becbc8282ffa15f919e01168149d8d8814a9 (plain)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
.. This work is licensed under a Creative Commons Attribution 4.0 International License.
.. http://creativecommons.org/licenses/by/4.0
.. (c) Ericsson AB

============================================================
Compliance and Verification program system preparation guide
============================================================

.. toctree::
   :maxdepth: 2

Version history
===============

+------------+----------+------------------+----------------------------------+
| **Date**   | **Ver.** | **Author**       | **Comment**                      |
|            |          |                  |                                  |
+------------+----------+------------------+----------------------------------+
| 2017-04-25 | 0.0.1    | Chris Price      | Draft version                    |
|            |          |                  |                                  |
+------------+----------+------------------+----------------------------------+


Introduction
============

This system preparation guide provides a detailed outline of the needed system prerequisites
and expectations for running OPNFV evaluation testing.

Test planning and preparation
=============================

https://jira.opnfv.org/browse/DOVETAIL-384

Give an outline of the planning phase.

--------------
Pre-requisites
--------------

Describe what needs to be in place before starting.

Required Infrastructure, connectivity needs, LF & CVP accounts and any additional security or peripheral needs.
Use sub-chapters for instance for any accounts etc that need to be created.

-------------------------------------------
Preparing the virtualisation infrastructure
-------------------------------------------

Briefly state what will be tested as an intro, then outline the required system state to be achieved prior to running the tests.

Preparing the test staging host system
--------------------------------------

https://jira.opnfv.org/browse/DOVETAIL-385

What is required from the system running the CVP test suites?

Required network configuration
-------------------------------

https://jira.opnfv.org/browse/DOVETAIL-386

VLAN configurations required for NFV deployments.  Non-VLAN configurations if needed.

Preparing your system for CVP testing
-------------------------------------

https://jira.opnfv.org/browse/DOVETAIL-387

Describe how to realise the "Pharos ready state" and the "Software ready state" in this section.