summaryrefslogtreecommitdiffstats
path: root/etc/compliance/onap.1.0.0.yml
AgeCommit message (Collapse)AuthorFilesLines
2018-07-31Renaming test cases to include test framework namesGeorg Kunz1-1/+1
Replacing the generic "dovetail" prefix of the testcase definitions with the name of the OPNFV test framework which hosts the test. JIRA: DOVETAIL-719 Signed-off-by: Georg Kunz <georg.kunz@ericsson.com> Change-Id: I8f90423b8908197bdc7adddf82c61ff394893f52
2018-07-17Update test suite ovp.nextxudan1-1/+2
Update test suite ovp.next according to the latest OVP scope. Modify Dovetail daily jobs to run all the scope. There should be 2 jobs. One for all mandatory test cases and the other for all optional ones. That's mainly because of that the total executed time will be too large (more than 300 minutes). Then the job will always failed because of time out. It's hard to enlarge the time because it's already larger than common 3 hours. Split it into 2 jobs can avoid the time out issue and make the results clearer for reviewing. JIRA: DOVETAIL-694 Change-Id: Ie0ea6221868941781af1477f7c7719f7cb4351a4 Signed-off-by: xudan <xudan16@huawei.com>
2018-03-29Integrate dovetail with ONAPMoshe1-0/+5
Change-Id: I6a1fa5f27df2f5127eb00156b3135dc79caf5e77 Issue-ID: DOVETAIL-629 Signed-off-by: Moshe <moshehoa@amdocs.com>