Age | Commit message (Collapse) | Author | Files | Lines |
|
JIRA: DOVETAIL-476
1. docker image used
yardstick: danube.3.1
functest: cvp.0.2.0
bottlenecks: cvp.0.4.0
testapi: cvp.0.4.0
dovetail: cvp.0.4.0
2. main changes
Add docs about vping test cases (test scope and test specification)
Add 2 vping test cases into proposed_tests
Bugfix: Build docker image failed because of lacking of packages
Add resiliency.tc001 into proposed_tests
3. For more information, refer to
https://wiki.opnfv.org/display/dovetail/Running+history+for+the+dovetail+tool
Change-Id: I5ce6bdc9a1daa957124309c9fadc532f9c7a2b1e
Signed-off-by: xudan <xudan16@huawei.com>
|
|
JIRA: dovetail-471
User can access results through the web page
browser the public results uploaded by others or himself
upload the results, and set this results as public or private to others
Change-Id: I9834a670f5dff6412a0290d9a5dd729bcece2933
Signed-off-by: grakiss <grakiss.wanglei@huawei.com>
|
|
|
|
Adding test case descriptions for both vping test cases implemented in
Functest. Test case 1 makes use of the config drive mechanism of
Nova to pass a test script. Test case 2 uses SSH to transfer and execute
a script on one VM.
Change-Id: Ic8be6ad4dfd4b0e7661064506b0ae92db2fc1463
Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>
|
|
JIRA: DOVETAIL-468
1. docker image used
yardstick: danube.3.1
functest: cvp.0.2.0
testapi: cvp.0.3.0
dovetail: cvp.0.3.0
2. main changes
fix dovetail docker version to be 17.03.0-ce
adapt yardstick danube.3.1
For more information, refer to
https://wiki.opnfv.org/display/dovetail/Running+history+for+the+dovetail+tool
Change-Id: Ie8bb2cfbad4b416404f5aaa2c40c1d3832be676f
Signed-off-by: xudan <xudan16@huawei.com>
|
|
|
|
JIRA: DOVETAIL-461
1. Lincoln’s comments about tc018-tc021: change “using DHCPv6” to “using DHCPv6 stateless”
2. Update tc018-tc025: give more details and modify some misunderstanding about these test cases.
For more detail, please refer to jira or this patch.
Change-Id: Ieb7ee9d0b8a31826c7f2f69cb5f209055fd7b928
Signed-off-by: hongbotian <hongbo.tianhongbo@huawei.com>
|
|
Fixing comment issues and updating to new version of dovetail.
Change-Id: Iaa9243d0a835f1d050fb925fa75b2a770168a8f4
Signed-off-by: Wenjing Chu <chu.wenjing@gmail.com>
|
|
JIRA: DOVETAIL-452
since https://gerrit.opnfv.org/gerrit/#/c/34577/ merged
new ipv6 C&C documents are there, delete the old ones.
Change-Id: Ic16cf03b3febd7cca158555e11ecd817ffc61139
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
|
|
Modify HA testcases.rst file to include detail discribtion of the 8
testcases. Rename the original rst file into HA testcases outline.rst.
Please review and see if you need two of these file, or you prefer a
single one, or maybe merge these two.
as discussed,propose 8 HA testcases for mandatory test cases.
JIRA:
Change-Id: Ie6cd5a68897bb0208932d2e1fec65cc59bfa25b4
Signed-off-by: fuqiao@chinamobile.com
|
|
Change-Id: Icdb2786076aa6a263449eca5db4a07d14f1e2adf
Signed-off-by: Bin Hu <bh526r@att.com>
|
|
Included the tests for SDNVPN in the docetail scope document
Performed spell checking of the committed test area document and included
the section around test suite structure. This patch should be reviewed
and approved by the SDNVPN team prior to being merged.
Change-Id: Ia2f9a1bddb02b9191da1239a73f121dce6687af1
Co-Authored-By: Georg Kunz <georg.kunz@ericsson.com>
Co-Authored-By: ChristopherPrice <christopher.price@ericsson.com>
Signed-off-by: ChristopherPrice <christopher.price@ericsson.com>
Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>
|
|
JIRA: DOVETAIL-431
in order to show more details of the test cases,
all below information are added:
the Use case specification, Test preconditions, Basic test flow execution description,
pass/fail criteria, and Post conditions
Change-Id: Id1886be6a868813f2cff6cacf42329494e94308c
Signed-off-by: hongbotian <hongbo.tianhongbo@huawei.com>
|
|
It is not clear that there are post conditions to be documented for all test cases.
In the case a test cse creates an image and deletes it, there is littöe need for
a post condition to be documented. If a test case establishes a network to be
used for a subsequent test ina sequence this information should be clearly dcumented.
Change-Id: Ifb4bb45f240921c180077ab7273988d973417f6f
Signed-off-by: ChristopherPrice <christopher.price@ericsson.com>
|
|
|
|
|
|
To be aligned with the committers and agreed as the "foundation" list of
test scope for moving forward with DoveTail test selection.
Requires a majority of committer approvals prior to merging.
Change-Id: I5fb091d2190a183d24ba9e766d19aba9e6a7c094
Signed-off-by: ChristopherPrice <christopher.price@ericsson.com>
Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>
|
|
JIRA: DOVETAIL-418
1) ipv6 tc002-tc005 error fix, delete wrong testcases
2) ipv6 tc018-tc025 os-nosdn-nofeature scenario dependent, make
it known to the users
Change-Id: I8e63131b795403ee63566ae59bf46782524acd5a
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
This should be considered in the danube CVP phase as an
optional test area for OPNFV compliance
Change-Id: I99494cf2246e1cf079b87414ef1bb34d9b26e6b3
Co-Authored-By: Tim Irnich <tim.irnich@ericsson.com>
Signed-off-by: ChristopherPrice <christopher.price@ericsson.com>
|
|
Implemented a directory and file structure that supports the requirements defined
in the plugfest etherpad: https://etherpad.opnfv.org/p/cvp_tooling_sketch
Change-Id: Icb7d2db4b0132f2039c680883e173ff5d7fc0120
Signed-off-by: ChristopherPrice <christopher.price@ericsson.com>
|
|
This document shall describe guidelines and evaluation criteria for
reviewers on how to handle the review process of results.
DOVETAIL-408
Change-Id: I78e669544bc172b74f94443176a48082a4c28a2f
Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>
|
|
This doucment needs to be +2'd by the majority of committers prior to merging
to ensure we are all in agreement with regard to the test case requirements.
This is a pre-requisite to test case selection for the CVP.
Updated by dneary 2017-04-25: List formatting, and reorganising requirements for installer and stack composition.
Change-Id: Iabaf11bc9479a20a58f985233d460013e4690d7c
Signed-off-by: ChristopherPrice <christopher.price@ericsson.com>
|
|
inprovements.
JIRA tasks are being created for specific sections of the document.
Refer to the doc for links to relevant JIRA tasks.
Change-Id: I1717d56b8817c38802a227db320f30029f68fbd0
Signed-off-by: ChristopherPrice <christopher.price@ericsson.com>
|
|
JIRA: DOVETAIL-395
1. since plugfest has its own plan, the files are removed
Change-Id: I4989d1e0e1af483205733b3130e3f1152a8933c7
Signed-off-by: hongbotian <hongbo.tianhongbo@huawei.com>
|
|
JIRA: DOVETAIL-352
Needs a lot more work, but the directory tree and layout are according to our
needs in order to have this published as a CVP document. Will push patches
to restructure the repo according to the new requirements later.
Change-Id: I9d4316407c94bc3096d322f6206eccf236d349da
Signed-off-by: ChristopherPrice <christopher.price@ericsson.com>
|
|
Change-Id: I33eea93ca0db018a5f79041152516fa48b94ba46
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
JIRA: DOVETAIL-182
Change-Id: Icbfa347dda3840520484d10b9d539da9c8f1d31c
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
JIRA: DOVETAIL-184
Change-Id: I6d466dc34de027faab1aa74f66cc6c8e453111d1
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
JIRA: DOVETAIL-183
1)pip install [options] [-e] <local project path> ...
pip install [options] <archive url/path> ...
2)vim added in Dockerfile, which is convinience for offline usage
Change-Id: I986dc7cd3e872cf026d2e69f7298028a6cbfe9a6
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
JIRA: DOVETAIL-181
Change-Id: I6e79467b829b4ae1d815bdb9ead0b930f0338cd2
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
JIRA: DOVETAIL-170
Change-Id: Id56e30fdb3fb5b652e2145dd406b71986997f200
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
|
|
JIRA: DOVETAIL-155
errors can refer to
https://build.opnfv.org/ci/job/opnfv-docs-verify-master/3727/console
Change-Id: I19e96239c8183bafca731477723615caff71388b
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
|
|
Migrate the custom setup.py to a more formal setup
environment using tox, in the same way that OpenStack
configures their projects.
Adds metadata to tox.ini from the setup.py file, and breaks
out the dependencies from setup.py into requirements.txt
and test-requirements.txt.
Executes flake8 testing for pep8 coverage.
Defaults to using Python 2 for the environment.
Change-Id: Ieaea7d9f3dc227febd8fb1dc9142d478ba197a92
Signed-off-by: Leif Madsen <lmadsen@redhat.com>
Signed-off-by: zshi <zshi@redhat.com>
|
|
|
|
Add how to build container from dockerfile and add missing config
for CentOS dockerfile. This fix is verified that functest/yeardstick
are called successfully under debug/proposed_tests testsuite.
Change-Id: Icb31331ecd78b8fccd69ac960c24340b605e54bf
Signed-off-by: Tomofumi Hayashi <tohayash@redhat.com>
|
|
JIRA: DOVETAIL-50
Change-Id: I65c618ce3de78677b9e66a1c2d7f0af705e80cfb
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
1. document for developers about how to add or delete commands by modifying
cmd_config.yml file.
2. document for users about how to run dovetail tool with CLI
JIRA: DOVETAIL-25
Change-Id: Iecf9d7a230e694bdda5634a87f7e5ddf7b7a57fd
Signed-off-by: xudan <xudan16@huawei.com>
|
|
JIRA: DOVETAIL-151
This diff introduces an optional dovetail dockerfile based on CentOS.
It provides users to have an alternative way to execute dovetail.
It should be just a optional, so we should keep docker/Dockerfile
as official one with dockerhub's image and we do not build docker images
in CI phase for now.
Change-Id: Ia694bcd49f65ff2bc175c1da3b42fbfa19b022a1
Signed-off-by: Tomofumi Hayashi <tohayash@redhat.com>
Signed-off-by: Zenghui Shi <zshi@redhat.com>
|
|
JIRA: DOVETAIL-71
1) argument testarea is added
2) terminology "scenario" change to "testsuite"
3) related documents amended
4) all word "certification" changed to "compliance"
Change-Id: I038a9e04bf83cfdac20f0c59adb1841bf5470584
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
JIRA: DOVETAIL-50
1)'proposed_tests.yml' is added, which runs as the total tests run.
The 'compliance_set.yml' will run as dovetail certification tests;
2)ipv6 test cases added accroding to 'docs/testsuites/ipv6/ipv6_all_testcases',
tc026 missed temporarily,yardstick ipv6tc026 only supports 2 installers by now
according to https://wiki.opnfv.org/display/dovetail/Dovetail+Test+Cases
3)vimops001-006 added for VIM images operation test cases
4)nfvi001-002 added for vping ssh/userdata in fucntest
5)more test cases can be added in future in proposed_tests.yml,
besides, the test cases can be adjusted in future in proposed_tests.yml
Change-Id: I8a8634583549a802f6f64fbea651e7be4efa361c
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
JIRA: DOVETAIL-28
1) documents are reorganized, all dovetail tool related documents are moved to /docs/dovetailtool
2) some sections are rewritten to make it more clear
Change-Id: Ib0c23b8c1771eb6de7d6cc264c101e8e26ed3d1f
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
JIRA:DOVETAIL-28
Change-Id: I2478655d951a65a11f39e9ceba10969e56274cc3
Signed-off-by: Leo Wang <grakiss.wanglei@huawei.com>
|
|
JIRA: DOVETAIL-9
1. We are keeping the test methodology simple and easy.
We are reusing existing tests as much as we can from
IPv6 projects and Tempest API and Scenario tests, which
are run in FuncTest and Yardstick.
2. We modified "testplan.rst" to briefly describe the test plan,
i.e. current IPv6 test cases for platform compliance, which
have passed FuncTest and Yardstick test in Arno and Brahmaputra
releases. We also leave room for additional IPv6 test cases if
there are more contributions down the road
3. Original "designspecification.rst", "testprocedure.rst" and
"testspecification.rst" are not applicable any more here. The
test design, setup, and execution procedure related specification
are covered by each test case.
4. Thus "index.rst" only covers "testplan.rst" and the list of test cases.
5. Two examples of test case specification documents are provided
"ipv6.tc001.specification.rst"
"ipv6.tc026.specification.rst"
6. A complete set of current IPv6 test cases are listed in
"ipv6_all_testcases.rst". Once template is agreed, we will converted
it into specific test case document.
For more background of IPv6, and its features and technical details, please see:
https://wiki.opnfv.org/display/ipv6/IPv6+Home
http://artifacts.opnfv.org/ipv6/docs/installationprocedure/index.html
Change-Id: I7e47c73c0f02a407df278c93a3da2142b5cc86e5
Signed-off-by: Bin Hu <bh526r@att.com>
|
|
Adding the first draft of the IPv6 test suite.
This patch attempts to start the documentation according to the
proposal on https://wiki.opnfv.org/pages/viewpage.action?pageId=6827269
The text is neither complete nor accurate at this stage, this patch
is intended to establish a concrete dialog for how we structure our
test suites and reference test cases.
Change-Id: I156ddafa3e8b7630390523864490426fc742eb3a
Signed-off-by: ChristopherPrice <christopher.price@ericsson.com>
|
|
JIRA: DOVETAIL-7
Change-Id: Ic17a05ea15858f6f93f112f26b532339f5904178
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
|
|
Change-Id: I6a81e832a311096d70acabe3dba20e8736d74ea7
Signed-off-by: ChristopherPrice <christopher.price@ericsson.com>
|