Age | Commit message (Collapse) | Author | Files | Lines |
|
Migrate the custom setup.py to a more formal setup
environment using tox, in the same way that OpenStack
configures their projects.
Adds metadata to tox.ini from the setup.py file, and breaks
out the dependencies from setup.py into requirements.txt
and test-requirements.txt.
Executes flake8 testing for pep8 coverage.
Defaults to using Python 2 for the environment.
Change-Id: Ieaea7d9f3dc227febd8fb1dc9142d478ba197a92
Signed-off-by: Leif Madsen <lmadsen@redhat.com>
Signed-off-by: zshi <zshi@redhat.com>
|
|
JIRA: DOVETAIL-50
Change-Id: I65c618ce3de78677b9e66a1c2d7f0af705e80cfb
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
JIRA: DOVETAIL-151
This diff introduces an optional dovetail dockerfile based on CentOS.
It provides users to have an alternative way to execute dovetail.
It should be just a optional, so we should keep docker/Dockerfile
as official one with dockerhub's image and we do not build docker images
in CI phase for now.
Change-Id: Ia694bcd49f65ff2bc175c1da3b42fbfa19b022a1
Signed-off-by: Tomofumi Hayashi <tohayash@redhat.com>
Signed-off-by: Zenghui Shi <zshi@redhat.com>
|
|
JIRA: DOVETAIL-71
1) argument testarea is added
2) terminology "scenario" change to "testsuite"
3) related documents amended
4) all word "certification" changed to "compliance"
Change-Id: I038a9e04bf83cfdac20f0c59adb1841bf5470584
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
JIRA: DOVETAIL-50
1)'proposed_tests.yml' is added, which runs as the total tests run.
The 'compliance_set.yml' will run as dovetail certification tests;
2)ipv6 test cases added accroding to 'docs/testsuites/ipv6/ipv6_all_testcases',
tc026 missed temporarily,yardstick ipv6tc026 only supports 2 installers by now
according to https://wiki.opnfv.org/display/dovetail/Dovetail+Test+Cases
3)vimops001-006 added for VIM images operation test cases
4)nfvi001-002 added for vping ssh/userdata in fucntest
5)more test cases can be added in future in proposed_tests.yml,
besides, the test cases can be adjusted in future in proposed_tests.yml
Change-Id: I8a8634583549a802f6f64fbea651e7be4efa361c
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
JIRA: DOVETAIL-28
1) documents are reorganized, all dovetail tool related documents are moved to /docs/dovetailtool
2) some sections are rewritten to make it more clear
Change-Id: Ib0c23b8c1771eb6de7d6cc264c101e8e26ed3d1f
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|