diff options
author | 2017-12-22 14:48:10 +0100 | |
---|---|---|
committer | 2018-01-15 15:16:22 +0000 | |
commit | 6c99abc7aa0d101388bb904a231ceccda6ace4d9 (patch) | |
tree | 55e3bf97c8412b7f725bf91e8a9012da34ea2410 /docs/testing/user/testspecification/index.rst | |
parent | cd28f48393e20ae88ce0225cf45099dafe82b873 (diff) |
Changing CVP to OVP in the documentation
Due to the name change from 'CVP' to 'OVP', the documentation has to be
updated.
Change-Id: Id934e8fc07f60802f7aa6b3d295d268c4c9b71f8
Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>
(cherry picked from commit 8f16dae9dae6d13bc6f5934bae5d26d420efd892)
Diffstat (limited to 'docs/testing/user/testspecification/index.rst')
-rw-r--r-- | docs/testing/user/testspecification/index.rst | 10 |
1 files changed, 5 insertions, 5 deletions
diff --git a/docs/testing/user/testspecification/index.rst b/docs/testing/user/testspecification/index.rst index 858d02ce..2a8298c9 100644 --- a/docs/testing/user/testspecification/index.rst +++ b/docs/testing/user/testspecification/index.rst @@ -5,23 +5,23 @@ .. _dovetail-test_case_specification: ================================================== -Compliance Verification program test specification +OPNFV Verified Program test specification ================================================== Introduction ============ -The OPNFV CVP provides a series or test areas aimed to evaluate the operation +The OPNFV OVP provides a series or test areas aimed to evaluate the operation of an NFV system in accordance with carrier networking needs. Each test area contains a number of associated test cases which are described in detail in the associated test specification. -All tests in the CVP are required to fulfill a specific set of criteria in -order that the CVP is able to provide a fair assessment of the system under +All tests in the OVP are required to fulfill a specific set of criteria in +order that the OVP is able to provide a fair assessment of the system under test. Test requirements are described in the 'Test Case Requirements'_ document. -All tests areas addressed in the CVP are covered in the following test +All tests areas addressed in the OVP are covered in the following test specification documents. .. toctree:: |