diff options
author | Christopher Price <christopher.price@ericsson.com> | 2017-04-26 09:59:05 +0000 |
---|---|---|
committer | Gerrit Code Review <gerrit@opnfv.org> | 2017-04-26 09:59:05 +0000 |
commit | 2fbc0733dbcebb9d3155775e7001977f909ffd50 (patch) | |
tree | f036439290641f0fcd0be9ac142660e79ae979fc /docs/testing/user/systempreparation/index.rst | |
parent | 4ee4bfd19fd2d9e8328e9594c6eb3a00ec67878d (diff) | |
parent | 48489a3e205014420bdb7d604e99b07e4fd8736b (diff) |
Merge "JIRA: DOVETAIL-352 Updating the test specification document with iterative inprovements."
Diffstat (limited to 'docs/testing/user/systempreparation/index.rst')
-rw-r--r-- | docs/testing/user/systempreparation/index.rst | 72 |
1 files changed, 72 insertions, 0 deletions
diff --git a/docs/testing/user/systempreparation/index.rst b/docs/testing/user/systempreparation/index.rst new file mode 100644 index 00000000..3364becb --- /dev/null +++ b/docs/testing/user/systempreparation/index.rst @@ -0,0 +1,72 @@ +.. This work is licensed under a Creative Commons Attribution 4.0 International License. +.. http://creativecommons.org/licenses/by/4.0 +.. (c) Ericsson AB + +============================================================ +Compliance and Verification program system preparation guide +============================================================ + +.. toctree:: + :maxdepth: 2 + +Version history +=============== + ++------------+----------+------------------+----------------------------------+ +| **Date** | **Ver.** | **Author** | **Comment** | +| | | | | ++------------+----------+------------------+----------------------------------+ +| 2017-04-25 | 0.0.1 | Chris Price | Draft version | +| | | | | ++------------+----------+------------------+----------------------------------+ + + +Introduction +============ + +This system preparation guide provides a detailed outline of the needed system prerequisites +and expectations for running OPNFV evaluation testing. + +Test planning and preparation +============================= + +https://jira.opnfv.org/browse/DOVETAIL-384 + +Give an outline of the planning phase. + +-------------- +Pre-requisites +-------------- + +Describe what needs to be in place before starting. + +Required Infrastructure, connectivity needs, LF & CVP accounts and any additional security or peripheral needs. +Use sub-chapters for instance for any accounts etc that need to be created. + +------------------------------------------- +Preparing the virtualisation infrastructure +------------------------------------------- + +Briefly state what will be tested as an intro, then outline the required system state to be achieved prior to running the tests. + +Preparing the test staging host system +-------------------------------------- + +https://jira.opnfv.org/browse/DOVETAIL-385 + +What is required from the system running the CVP test suites? + +Required network configuration +------------------------------- + +https://jira.opnfv.org/browse/DOVETAIL-386 + +VLAN configurations required for NFV deployments. Non-VLAN configurations if needed. + +Preparing your system for CVP testing +------------------------------------- + +https://jira.opnfv.org/browse/DOVETAIL-387 + +Describe how to realise the "Pharos ready state" and the "Software ready state" in this section. + |