summaryrefslogtreecommitdiffstats
path: root/docs/plugfest_test_plan/templates
diff options
context:
space:
mode:
authorLincoln Lavoie <lylavoie@iol.unh.edu>2016-02-24 17:34:06 -0500
committerChristopherPrice <christopher.price@ericsson.com>2016-03-02 10:16:40 +0100
commit85b579d153aa713e1b89faa7fcfa7a9a934829ad (patch)
treee03d2c8221e1a61f52ef8480bf9754218af6dcf4 /docs/plugfest_test_plan/templates
parent328ca6847ee842ac8050d723114e2b54d3cd71ea (diff)
Initial test plan structure for Brahmaputra
Created the initial structure for the plugfest test plan. * Created a base directory and document structure * Created contributor guidelines * Created test case template * adjusted for: http://artifacts.opnfv.org/releng/docs/how-to-use-docs/documentation-example.html * cp: reformatted the directories and structure to use the RST format * (we cannot review odt format in our toolchain, so use rst) * cp: added an index.rst structure to establish structure without numbering * cp: will ad anothe job to include dovetail in the docs toolchain Change-Id: I4ef997da51b3b85e391629d6e08fadf87257fc6a
Diffstat (limited to 'docs/plugfest_test_plan/templates')
-rw-r--r--docs/plugfest_test_plan/templates/template.rst38
1 files changed, 38 insertions, 0 deletions
diff --git a/docs/plugfest_test_plan/templates/template.rst b/docs/plugfest_test_plan/templates/template.rst
new file mode 100644
index 00000000..6c655cca
--- /dev/null
+++ b/docs/plugfest_test_plan/templates/template.rst
@@ -0,0 +1,38 @@
+.. This work is licensed under a Creative Commons Attribution 4.0 International License.
+.. http://creativecommons.org/licenses/by/4.0
+
+Test case title
+---------------
+
+Purpose
+^^^^^^^
+
+Description of the intended purpose of the test case.
+Purpose may also describe the cause/need of the test case,
+such as, describing a specific high availability failover cause.
+
+References
+^^^^^^^^^^
+
+Pointer to specific reference in standard, architecture, or other documentation.
+
+Test Setup
+^^^^^^^^^^
+
+1. List of equipment or software specific to this test case.
+2. List of steps required to prepare the devices / network for testing.
+3. These steps need to be performed only once.
+
+Method of Procedure
+^^^^^^^^^^^^^^^^^^^
+
+1. List of steps to perform the actual test case
+2. These steps might be performed multiple times, if a retest is required.
+
+Expected Results
+^^^^^^^^^^^^^^^^
+
+1. List of specific results expected from the procedure.
+2. These results / test metrics are used to indicate the pass/fail status for the test case.
+3. To pass a test case, it all individual metrics would be expected to “pass.”
+