diff options
author | Wenjing Chu <chu.wenjing@gmail.com> | 2017-09-21 22:28:54 -0700 |
---|---|---|
committer | Wenjing Chu <chu.wenjing@gmail.com> | 2017-10-24 19:08:47 +0000 |
commit | 529bc14bb2a255df72b5196ac70b5d1579c98eac (patch) | |
tree | c0e5fc9f0e88ef541341a6398209a83bb5848e75 | |
parent | 413355acbcb70074d6861754ad8eb3de0423c417 (diff) |
System preparation guide
Change-Id: I4fc982d7037466b48424b7ce97d6207fbe44a09b
Signed-off-by: Wenjing Chu <chu.wenjing@gmail.com>
-rw-r--r-- | docs/testing/user/systempreparation/index.rst | 121 |
1 files changed, 55 insertions, 66 deletions
diff --git a/docs/testing/user/systempreparation/index.rst b/docs/testing/user/systempreparation/index.rst index 9d05a76a..fe1f60d6 100644 --- a/docs/testing/user/systempreparation/index.rst +++ b/docs/testing/user/systempreparation/index.rst @@ -1,74 +1,63 @@ -.. This work is licensed under a Creative Commons Attribution 4.0 International License. +.. This work is licensed under a Creative Commons Attribution 4.0 International +.. License. .. http://creativecommons.org/licenses/by/4.0 -.. (c) Ericsson AB +.. (c) Huawei, and others .. _dovetail-system_preparation_guide: ============================================================ -Compliance and Verification program system preparation guide +Compliance Verification Program system preparation guide ============================================================ -.. toctree:: - :maxdepth: 2 - -Version history -=============== - -+------------+----------+------------------+----------------------------------+ -| **Date** | **Ver.** | **Author** | **Comment** | -| | | | | -+------------+----------+------------------+----------------------------------+ -| 2017-04-25 | 0.0.1 | Chris Price | Draft version | -| | | | | -+------------+----------+------------------+----------------------------------+ - - -Introduction -============ - -This system preparation guide provides a detailed outline of the needed system prerequisites -and expectations for running OPNFV evaluation testing. - -Test planning and preparation -============================= - -https://jira.opnfv.org/browse/DOVETAIL-384 - -Give an outline of the planning phase. - --------------- -Pre-requisites --------------- - -Describe what needs to be in place before starting. - -Required Infrastructure, connectivity needs, LF & CVP accounts and any additional security or peripheral needs. -Use sub-chapters for instance for any accounts etc that need to be created. - -------------------------------------------- -Preparing the virtualisation infrastructure -------------------------------------------- - -Briefly state what will be tested as an intro, then outline the required system state to be achieved prior to running the tests. - -Preparing the test staging host system --------------------------------------- - -https://jira.opnfv.org/browse/DOVETAIL-385 - -What is required from the system running the CVP test suites? - -Required network configuration -------------------------------- - -https://jira.opnfv.org/browse/DOVETAIL-386 - -VLAN configurations required for NFV deployments. Non-VLAN configurations if needed. - -Preparing your system for CVP testing -------------------------------------- - -https://jira.opnfv.org/browse/DOVETAIL-387 - -Describe how to realise the "Pharos ready state" and the "Software ready state" in this section. +This document provides a general guide to hardware system prerequisites +and expectations for running OPNFV CVP testing. For detailed guide of +preparing software tools and configurations, and conducting the test, +please refer to the User Guide :ref:dovetail-testing_user_guide. + +The CVP test tools expect that the hardware of the System Under Test (SUT) +is Pharos compliant `Pharos specification`_ + +The Pharos specification itself is a general guideline, rather than a set of +specific hard requirements at this time, developed by the OPNFV community. For +the purpose of helping CVP testers, we summarize the main aspects of hardware to +consider in preparation for CVP testing. + +As described by the CVP Testing User Guide, the hardware systems involved in +CVP testing includes a Test Node, a System Under Test (SUT) system, and network +connectivity between them. + +The Test Node can be a bare metal machine or a virtual machine that can support +Docker container environment. If it is a bare metal machine, it needs to be a +x86 based at this time. Detailed information of how to configure and prepare the +Test Node can be found in the User Guide. + +The System Under Test (SUT) system is expected to consist of a set of general +purpose servers, storage devices or systems, and networking infrastructure +connecting them together. +The set of servers are expected to be of the same architecture, either x86-64 or +ARM-64. Mixing different architectures in the same SUT is not supported. + +A minimum of 5 servers, 3 configured for controllers and 2 or more configured for compute +resource are expected. However this is not a hard requirement +at this phase. The CVP 1.0 mandatory test cases only require one compute server. At +lease two compute servers are required to pass some of the optional test cases +in the current CVP release. CVP control service high availability tests expect two +or more control nodes to pass, depending on the HA mechanism implemented by the +SUT. + +The SUT is also expected to include components for persistent storage. The CVP +testing does not expect or impose significant storage size or performance requirements. + +The SUT is expected to be connected with high performance networks. These networks +are expected in the SUT: + +- A management network by which the Test Node can reach all identity, image, network, +and compute services in the SUT +- A data network that supports the virtual network capabilities and data path testing + +Additional networks, such as Light Out Management or storage networks, may be +beneficial and found in the SUT, but they are not a requirement for CVP testing. + +.. References +.. _`Pharos specification`: https://wiki.opnfv.org/display/pharos/Pharos+Specification |