aboutsummaryrefslogtreecommitdiffstats
path: root/docs/release/release-notes/auto-project-activities.png
AgeCommit message (Collapse)AuthorFilesLines
2018-08-23new version of Auto release notes for Gambia MS6Gerard Damm1-0/+0
JIRA: AUTO-53 Updates, new content since last edit (R6.2, end of June 2018). Includes a dynamic link to JIRA tickets with filters for Version and Status (and still a static manual selection of significant tickets in a table). Change-Id: Ib7883df491958a4e3945c3433ffc1dee4ab8b102 Signed-off-by: Gerard Damm <gerard.damm@wipro.com>
2018-06-28R6.2 updates for Auto Release Notes and Configuration GuideGerard Damm1-0/+0
JIRA: AUTO-41 Several updates in Release Notes and Configuration Guide, to capture changes and progress since R6.1. Included tickets 35,37,40, since they can still be done for 6.2. Patch 2: made updates based on comments (note: need to close by 6/28) Patch 3: minor edits, will merge today Patch 4: removed Jira tickets 35, 37, 40 from Auto release 6.2 Change-Id: I7547a9ea9b807c28513ce4e995d53a9f32223eb1 Signed-off-by: Gerard Damm <gerard.damm@wipro.com>
2018-04-12Release Notes April 12th update, for Fraser MS9Gerard Damm1-0/+0
JIRA: AUTO-26 added references to newly closed JIRA tickets, with clarified text added figure with Auto project activities added references other minor updates Change-Id: Ibf794a2fe7272a44a139a6192fa6c77bd95d3d1f Signed-off-by: Gerard Damm <gerard.damm@wipro.com>