summaryrefslogtreecommitdiffstats
path: root/tests/opnfv/test_suites
AgeCommit message (Collapse)AuthorFilesLines
2016-07-27Add HA Test Cases in Test Suitetjuyinkanglin1-0/+20
JIRA: YARDSTICK-306 Change-Id: Ib91f7663c03df0bcfa4d823745324b29fffcf18c Signed-off-by: tjuyinkanglin <14_ykl@tongji.edu.cn>
2016-07-26Update test_suite files for TC069, TC070 and TC071JingLu517-1/+102
Change-Id: I5015835a13d17973c64186b742562e9cf165c427 Signed-off-by: JingLu5 <lvjing5@huawei.com>
2016-07-26complement sceanrio for joid, apex, noharexlee87767-0/+154
Change-Id: I6ccec0ff2bb05d9263691096c9306a0374aa7406 Signed-off-by: rexlee8776 <limingjiang@huawei.com>
2016-07-20add support for suite to support constraints and task_argsrexlee87761-7/+16
suite.yaml has constraint and task_args parameter, so each task_case can be able to add constaints (currently support pod_name and installer), also support parameters to be replace for special test case like tc043. JIRA: YARDSTICK-299 Change-Id: I2b2c8f9858893da03aaa8bcac20a474a2d434509 Signed-off-by: rexlee8776 <limingjiang@huawei.com>
2016-07-15change ci from base-on-pod to base-on-scenario (in progress)rexlee877611-0/+242
1. first need to change in yardstick 2. then change in releng to modify the input parameter JIRA: YARDSTICK-299 Change-Id: I3d707721acbc1d63be34da4e98138f845dc93466 Signed-off-by: rexlee8776 <limingjiang@huawei.com>
2016-07-08bug fix for huawei-pod2kubi1-2/+0
Since TC027 depends on specific pod configure, so it only should be run at huawei-pod1 JIRA:- Change-Id: Ib85daae64ce97cad907dbaa8309c80cf4f0153b5 Signed-off-by: kubi <jean.gaoliang@huawei.com>
2016-07-06Add fuel test suiteJingLu51-0/+12
This file is used for verifing yardstick in fuel integration. Change-Id: Ied9f714763f974af5a3abd953f66c966f196c4ec Signed-off-by: JingLu5 <lvjing5@huawei.com>
2016-05-26OPNFV_YARDSTICK_TC043_Latency_between_NFVI_nodes_measurementsrexlee87762-1/+5
JIRA: YARDSTICK-258 Change-Id: I330fecead430618cb1a16e3e02d92b1a3bc5875a Signed-off-by: rexlee8776 <limingjiang@huawei.com>
2016-05-25enable yardstick in huawei-pod2meimei1-0/+24
JIRA: COMPASS-393 Change-Id: I46c0ac05b602fa8bf07906d9bc5f0bc8f499e20c Signed-off-by: meimei <meimei@huawei.com>
2016-05-23Update test suite files used for LF PODsFatih Degirmenci2-0/+0
Change-Id: I69690c5a17aae6bd9bad883c4be523a630eb0f83 Signed-off-by: Fatih Degirmenci <fatih.degirmenci@ericsson.com>
2016-05-17Update test suite files used for Huawei PODs/machinesFatih Degirmenci8-0/+0
Change-Id: Ic52d1eec693ef9278d4a196962e8b3ede907dbeb Signed-off-by: Fatih Degirmenci <fatih.degirmenci@ericsson.com>
2016-05-12Update test suite file used for orange-fr-pod2Fatih Degirmenci1-1/+1
Orange slaves connected to Jenkins have been renamed in an effort to unify naming of the slaves. This update reflects the same change to yardstick as well. Change-Id: I7b4b8ca1aa557a649b7a37d78e272045dff478e8 Signed-off-by: Fatih Degirmenci <fatih.degirmenci@ericsson.com>
2016-05-11Due to rename ZTE jenkins slave, synchronize ZTE test suit name.wu.zhihui1-0/+0
JIRA: YARDSTICK-260 Change-Id: I5587ac41c6112c9d4275809de28a1dc18d9b05a0 Signed-off-by: wu.zhihui <wu.zhihui1@zte.com.cn>
2016-05-06Add plugfest test suiteQiLiang1-0/+22
JIRA: - Change-Id: I0f127d7a27e788575ad34ee3a0aa6a75bbf61450 Signed-off-by: QiLiang <liangqi1@huawei.com>
2016-04-08add huawei shanghai pod6 daily suitekubi1-0/+22
add a huawei pod6 test suite yaml to verify generic test case Change-Id: I50938617c1093bedb9732702b3330a044528f122 Signed-off-by: kubi <jean.gaoliang@huawei.com>
2016-03-22Added a Yardstick test scenario for the OPNFV-Playground development CI pipelineJonas Bjurel1-0/+22
Change-Id: I6d2e825c1080bb91c8b0f91ab0f37ce66462bcb9 Signed-off-by: Jonas Bjurel <jonas.bjurel@ericsson.com>
2016-02-26Add test suite for huawei shanghai podQiLiang1-0/+22
JIRA: - Change-Id: If314e5e7b3f93a3368452b7401e320ce0c64b99f Signed-off-by: QiLiang <liangqi1@huawei.com>
2016-02-16Add test suite for ericsson-virtual1 bladeFatih Degirmenci1-0/+22
Change-Id: I6c22a32fd3197a5475ee4f41db946bd78b08dfa0 Signed-off-by: Fatih Degirmenci <fatih.degirmenci@ericsson.com>
2016-02-08bug fix: huawei sc lab virtual pod task failkubi4-8/+0
opnfv_yardstick_tc027.yaml 's configure file is written for physical pod it shouldn't be added into virtual pod task, so remove it. otherwise, task will failed Change-Id: Ic2f03c6522cace32426a7aade1da56ed2c1766d1 Signed-off-by: kubi <jean.gaoliang@huawei.com>
2016-01-30Add test suites for huawei lab virtual deployQiLiang3-0/+72
JIRA: - Change-Id: Ibc44bf11fb8bef4878ec57187877624a557f9937 Signed-off-by: QiLiang <liangqi1@huawei.com>
2016-01-28Add test suite for huawei lab virtual deployQiLiang1-0/+24
JIRA: - Change-Id: I0cd58a2acb0a2a55431eebd6b4adcde95d50d7bc Signed-off-by: QiLiang <liangqi1@huawei.com>
2016-01-18Create weekly Jenkins Job for Yardstick run in Huawei lab in Santa Clarakubi1-0/+26
Test Case 040 :parser is added into weekly yaml Signed-off-by: kubi <jean.gaoliang@huawei.com> Change-Id: I0cb4a9e273b5cac55b9a7a278ea17b1ad78d1ac6
2016-01-16enable ipv6 test case in sc labkubi1-0/+2
Change-Id: I4609fcb4427413fd6cde435f7bd062c9dde61949 Signed-off-by: kubi <jean.gaoliang@huawei.com>
2016-01-15Update test suite files.Jo¶rgen Karlsson10-20/+60
Added TC 10, 11 and 14. Removed TC 1 as it is already included in TC 37 Change-Id: Iea483c4a26c657984769400f2949ca300c2504bd Signed-off-by: Jo¶rgen Karlsson <jorgen.w.karlsson@ericsson.com>
2016-01-14Add test suite for Orange POD2Jo¶rgen Karlsson1-0/+18
Change-Id: I667a54793be39c74a9f787b055b07fda9b2ba06c Signed-off-by: Jo¶rgen Karlsson <jorgen.w.karlsson@ericsson.com>
2016-01-11Add vTC daily+weekly test suitesJo¶rgen Karlsson2-0/+32
Change-Id: Id557b5ef4d686da041b8097e390c7e5b563a0c3c JIRA:- Signed-off-by: Jo¶rgen Karlsson <jorgen.w.karlsson@ericsson.com>
2016-01-11Add test case description and task file for TC005QiLiang10-0/+20
JIRA: YARDSTICK-93 Change-Id: I74adef0e6bae52a7080479d7054a92342f7324a7 Signed-off-by: QiLiang <liangqi1@huawei.com>
2016-01-08Add TC037 to POD test suitesJo¶rgen Karlsson10-0/+20
JIRA: YARDSTICK-213 Change-Id: I55ff36b02a0d0e0334505d68d361b8a14d36063c Signed-off-by: Jo¶rgen Karlsson <jorgen.w.karlsson@ericsson.com>
2016-01-06Add yardstick daily suite config files for CI PODsFatih Degirmenci5-0/+70
opnfv-jump-1: apex stable/brahmaputra branch intel-pod5: joid stable/brahmaputra branch intel-pod2: apex master branch intel-pod6: joid master branch intel-pod8: compass master branch Change-Id: Ia659e10525863ee11854a266df58449c625c7f7c Signed-off-by: Fatih Degirmenci <fatih.degirmenci@ericsson.com>
2016-01-04Add test suite file for ZTE-NJ LAB.wu.zhihui1-0/+14
JIRA: yardstick-210 Change-Id: Ib888b654e742761a8be1b263f643950ea02380f8 Signed-off-by: wu.zhihui <wu.zhihui1@zte.com.cn>
2015-12-21Add yardstick daily task suite for Ericsson POD2Fatih Degirmenci1-0/+14
Change-Id: Ic0f7261dc07eb38d014a8790ac13e5310ec4ef8a Signed-off-by: Fatih Degirmenci <fatih.degirmenci@ericsson.com>
2015-12-17Add TC001 and TC012 to POD test suitesJo¶rgen Karlsson3-1/+13
Change-Id: I39d589bfc0652d51b7e6d9e139b83160bf7f3692 Signed-off-by: Jo¶rgen Karlsson <jorgen.w.karlsson@ericsson.com>
2015-12-15add test suite for huawei us bare labkubi1-0/+10
JIRA:YARDSTICK- Change-Id: I6e43383c1eafa13314ab7678d0e1d42ed063c57f Signed-off-by: kubi <jean.gaoliang@huawei.com>
2015-12-11Rename daily test suite files to match slave names on JenkinsFatih Degirmenci2-0/+0
Change-Id: Ic4ee5d21f09fd324583f8a2c55e99684fbddd70b Signed-off-by: Fatih Degirmenci <fatih.degirmenci@ericsson.com>
2015-12-08Docker image cleanupJo¶rgen Karlsson2-1/+11
- Renamed docker image 'opnfv/yardstick-ci' -> 'opnfv/yardstick' as recommended by project. - Added cirros image and releng repo to docker image in order to make it more usable in offline mode. - Renamed run_benchmarks to run_tests.sh - Moved some environment setups to a new file prepare_env.sh - Added daily test suites file for ericsson and LF pods. Docker image is now built and pushed by releng script: https://gerrit.opnfv.org/gerrit/gitweb?p=releng.git;a=blob;f=jjb/opnfv/opnfv-docker.sh The ci/docker/Makefile file is not used by releng to build yardstick image but the makefile can still be used to build and test docker images locally. Change-Id: If9d6740b39e91d145c587d8d5e2bd372d09a46a9 Signed-off-by: Jo¶rgen Karlsson <jorgen.w.karlsson@ericsson.com>
2015-10-13Add test suite functionality to task commandsKristian Hunt1-0/+10
This patch proposes a more permanent solution to replace the already existing one (YARDSTICK-106). A test suite is a .yaml file which consists of multiple task files which are meant to run as a one set. Each test case in the test suite has to specify the location of the test .yaml task file and can specify additional task arguments or a task arguments file. It is possible to specify the directory where the task files are located in the suite file. If it is left unspecified then it defaults to tests/opnfv/test_cases according to https://etherpad.opnfv.org/p/yardstick_folders A Command line argument --suite is added to the task command. This argument indicates that the intention is to run a test suite. JIRA: YARDSTICK-107 Change-Id: I69508b3b536dd592b6240a2a32dd5d665e0ac4b4 Signed-off-by: Kristian Hunt <kristian.hunt@gmail.com>