diff options
author | Sam Hague <shague@redhat.com> | 2016-01-21 21:13:32 +0000 |
---|---|---|
committer | Gerrit Code Review <gerrit@172.30.200.206> | 2016-01-21 21:13:32 +0000 |
commit | b2a7d75ddab5dfce21c9e54d1806a018870127b2 (patch) | |
tree | 817c9fc91f1cb87c1a5d96b306411bd4c77285ce /docs/design/requirements.rst | |
parent | d667294349b816d7abd8f6fa9c3cdca626fa1da2 (diff) | |
parent | de5689105582602e6f2a453bfe9da196cdfc0a99 (diff) |
Merge "SFC design Documents for Brahmaptura release"
Diffstat (limited to 'docs/design/requirements.rst')
-rw-r--r-- | docs/design/requirements.rst | 41 |
1 files changed, 39 insertions, 2 deletions
diff --git a/docs/design/requirements.rst b/docs/design/requirements.rst index dbedc6f7..3a716351 100644 --- a/docs/design/requirements.rst +++ b/docs/design/requirements.rst @@ -1,4 +1,41 @@ Requirements -============ +------------ + +This section defines requirements for the initial OPNFV SFC implementation, +including those requirements driving upstream project enhancements. + +Minimal Viable Requirement +++++++++++++++++++++++++++ + +Deploy a complete SFC solution by integrating OpenDaylight SFC with OpenStack +in an OPNFV environment. + +Detailed Requirements ++++++++++++++++++++++ + +These are the Brahmaputra specific requirements: + +1 Placement of SFs on only one Compute node will be supported. + +2 The supported Service Chaining encapsulation will be NSH VXLAN-GPE. + +3 The version of OVS used must support NSH. + +4 The SF VM life cycle will be managed by the Tacker VNF Mgr. + +5 The supported classifiers will be either ODL Netvirt or ODL GBP. + +6 ODL will be the OpenStack Neutron backend and will handle all networking + on the compute nodes. + +Long Term Requirements +++++++++++++++++++++++ + +These requirements are out of the scope of the Brahmaputra release. + +1 Placing SFs on multiple Compute nodes. + +2 Dynamic movement of SFs across multiple Compute nodes. + +3 Load Balancing across multiple SFs -This section will define requirements for the initial OPNFV SFC implementation, including those requirements driving upstream project enhancements. |