Age | Commit message (Collapse) | Author | Files | Lines |
|
1. Jobs on Compass are always built time out and aborted.
2. Dovetail needs about 2 hours for all the test cases.
3. However, due to the slow internet speed, it will take a long time to pull
releng source code and dovetail docker image.
4. Extend the time to 240 minutes.
5. Don't remove the stable docker images, so it don't need to pull every time.
JIRA: DOVETAIL-491
Change-Id: I9c7255a89eebf5770c0854224cd65e7413916078
Signed-off-by: xudan <xudan16@huawei.com>
|
|
JIRA: DOVETAIL-453
Change-Id: I40110eae6eac86953f482f83e0b082149c3d0377
Signed-off-by: xudan <xudan16@huawei.com>
|
|
artifacts
JIRA: DOVETAIL-433
1) bugfix of cleanup by using existed dovetail cleanup scripts, see logs
https://build.opnfv.org/ci/view/dovetail/job/dovetail-functest-artifacts-upload-master/3/console
2) opnfv/testapi:latest and mongo:3.5 images are needed for dovetail, added.
Change-Id: I647f7152b0122a5b792f6f18efbae0e537b81332
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
Change-Id: Id4f9f1ddb7d84e5780479a7ca2bc979132dde8d4
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
JIRA: DOVETAIL-152
Change-Id: Ib0ab73278b4a6dad83323647728fc2769cee3839
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|
|
JIRA: DOVETAIL-14
1)ci jobs are added
2)not daily/weekly run by now, only manually triggerd,
the manually trigger progress should be controlled not to
disturb the normal ci running progres
3)pods/platforms used are just examples to let the tool run,
more platforms will be supported.
Change-Id: I865e011ceb5b9957e7b58065cd231b26caf7ab87
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|