Age | Commit message (Collapse) | Author | Files | Lines |
|
Daily jobs for Colorado branch for installer and test projects
have not been created yet and it needs to be done via separate
patches.
Change-Id: I34517e89dfc502ce5741733e01bf8425d513df02
Signed-off-by: Fatih Degirmenci <fatih.degirmenci@ericsson.com>
|
|
This is the first step towards having alignment of the job structure, applying
commit gating and use of labels for all installer jobs.
Apart from the above, it also
- puts all CI baremetal and virtual PODs together
- gets rid of use of slaves directly for CI baremetal and virtual PODs
- switches labels for all CI baremetal and virtual PODs using below labels
{installer}-baremetal
{installer}-virtual
- puts all CI build slaves together and switches to labels - except huawei-build
- puts all none-CI PODs together
Please note that this change does not impact the overall job structure.
Change-Id: I2d8d15799a57fe7e063d39f81b96d19c218b100e
Signed-off-by: Fatih Degirmenci <fatih.degirmenci@ericsson.com>
|
|
This is a required field for JJB > 1.4
Change-Id: Ifb6f5d4b3a28f2d85f546151ca9aca4a4061f3ef
Signed-off-by: Trevor Bramwell <tbramwell@linuxfoundation.org>
|
|
We reconfigured centos build server now and it is important to
know which jobs require centos and which ones ubuntu. The machines
with ubuntu were labelled with opnfv-build previously, preventing
us from keeping track of which projects require what OS. This tries
to solve that.
Change-Id: I1fb2912ec49f5bc2781853e500508d9992d59fbb
Signed-off-by: Fatih Degirmenci <fatih.degirmenci@ericsson.com>
|
|
JIRA: BOTTLENECK-1
Change-Id: I05a02ca26778d4a8214e099356e8956b95176989
Signed-off-by: MatthewLi <matthew.lijun@huawei.com>
|