Age | Commit message (Collapse) | Author | Files | Lines |
|
Change-Id: Ia4c69a1f0e97b248308900818370c2340c8cc9c4
Signed-off-by: Bertrand Souville <souville@docomolab-euro.com>
(cherry picked from commit 7437f0783c95f448851217b85faf4ddafa1498b1)
|
|
This patch adds a first draft of the Promise userguide. Let's aim to
review and merge this draft asap and then use separate patches to fix
editorial issues and update the content.
JIRA: PROMISE-64
Change-Id: I891895938d115a327362d0297304a30390728435
Signed-off-by: Gerald Kunzmann <kunzmann@docomolab-euro.com>
(cherry picked from commit e16a07cdc9016c03aff00cd10076dfd2d4a142da)
|
|
JIRA: POMISE-58
Change-Id: I4ba518da301281142c06f9cf567dd932e6d93b23
Signed-off-by: Ildiko Vancsa <ildiko.vancsa@ericsson.com>
(cherry picked from commit 558f8a6e9377e8e5046593ca83ebc05883389745)
|
|
This patch is updating the message flow for "capacity management",
"reservation management", and "allocation management" for the shim-layer
architecture.
It also starts a new (but still empty) section on the shim-layers
internal logic and operations. This section will be updated with a
separate patch.
JIRA: PROMISE-63
Change-Id: I131a5c34c7e145153831556321e7366af0401c8c
(cherry picked from commit 555f6877d454259230db9444be7ca1d2c8994ff3)
|
|
Add the following guides to document Promise:
* Platform overview
* User guide
* Install and configuration guide
Change-Id: I3d2c05cf41c8c58f22cba2a3340d87fe78a67749
(cherry picked from commit e4f39a6ccdd98547c0b84abf399b97dbdc2afa23)
|
|
JIRA: PROMISE-62
Change-Id: I963bd25bf2a9daf431a1a81dc873f00e96362d72
Signed-off-by: Bertrand Souville <souville@docomolab-euro.com>
(cherry picked from commit cf6c391ec00de20f6173c8436ff6c705b67e5291)
|
|
JIRA: PROMISE-61
Change-Id: Ib9edcf3ef5db8b6ff403c0fdfb1575e1042f0f23
Signed-off-by: Bertrand Souville <souville@docomolab-euro.com>
(cherry picked from commit 89d72ce042b455a51df30224af99221ba89c64c0)
|
|
Create two sub-sections in "05 Detailed architecture" for the Shim-layer
architecture and the Integrated architecture.
Fix several implementations bugs and warnings. Remove numbering of
files.
JIRA: PROMISE-57
Change-Id: Ia0b4067c0cc3a461e54b6b010f8310764fb08d73
(cherry picked from commit 9fdb1e0b443e68f67b0978e27ec211bd7aa4cd89)
|
|
|
|
Several editorial fixes in the requirement document that result in
warning during the compilation.
JIRA: PROMISE-60
Change-Id: I54ccaddede9740b6be6b3aeebaefd670cf2beddd
|
|
This patch is adding the agreed use case for B-release to the Annex of
the requirement document.
JIRA: PROMISE-54
Change-Id: Id63bbcf49d53ddd07920721a5b9b12e9d9410036
|
|
Change-Id: Ifbf8a881d0e1a962f2e3cf276fe3942b1f03d3ee
Signed-off-by: Ryota MIBU <r-mibu@cq.jp.nec.com>
|
|
This code will be pushed to each project creating a docs/ directory
This servers as an example and template for you (the developers) to create
your own project documentation
Change-Id: I084e0af553c9f7e503fb55a3dd4990edbcf3394d
JIRA:RELENG-15
Signed-off-by: Aric Gardner <agardner@linuxfoundation.org>
|