summaryrefslogtreecommitdiffstats
path: root/docs/requirements/summary.rst
diff options
context:
space:
mode:
authorGerald Kunzmann <kunzmann@docomolab-euro.com>2017-02-09 09:36:29 +0000
committerGerald Kunzmann <kunzmann@docomolab-euro.com>2017-02-15 15:30:08 +0000
commit78aa63af02df682b3c8d825c1bec9cec6cd3b207 (patch)
tree26ea243c8ac8c6e921c1c93d8292eb569f814dae /docs/requirements/summary.rst
parentb74c2245db019bfadcae29190de4caa6fc6f826d (diff)
Update docs structure according to new guidelines in https://wiki.opnfv.org/display/DOC
Change-Id: I69e6536d9044dd9db2ed3cd698059aa3a800c318 Signed-off-by: Gerald Kunzmann <kunzmann@docomolab-euro.com>
Diffstat (limited to 'docs/requirements/summary.rst')
-rw-r--r--docs/requirements/summary.rst27
1 files changed, 0 insertions, 27 deletions
diff --git a/docs/requirements/summary.rst b/docs/requirements/summary.rst
deleted file mode 100644
index fcf10d1..0000000
--- a/docs/requirements/summary.rst
+++ /dev/null
@@ -1,27 +0,0 @@
-.. This work is licensed under a Creative Commons Attribution 4.0 International License.
-.. http://creativecommons.org/licenses/by/4.0
-
-======================
-Summary and conclusion
-======================
-
-Resource Reservation and Resource Capacity Management are features to be
-supported by the VIM and exposed to the consumer via the VIM NBI. These
-features have been specified by ETSI NFV.
-
-This document has described several use cases and corresponding high level
-flows where Resource Reservation and Capacity Management are of great benefit
-for the consumer of the virtualised resource management interface: the NFVO or
-the VNFM. The use cases include:
-
-* Notification of changes in capacity in the NFVI
-* Query of available resource capacity
-* Reservation of a resource or set of resources for immediate use
-* Reservation of a resource or set of resources for future use
-
-The Promise project has performed a gap analysis in order to fulfill the
-required functionality. Based on the gap analysis an implementation plan and
-way forward has been proposed, including a possible design architecture and
-high level information model. Immediate next steps of this project is to
-deliver a working Proof-of-Concepts (PoC) and engage upstream communities to
-fill out the gaps identified by Promise.