summaryrefslogtreecommitdiffstats
diff options
context:
space:
mode:
-rw-r--r--docs/testing/ecosystem/overview.rst44
1 files changed, 22 insertions, 22 deletions
diff --git a/docs/testing/ecosystem/overview.rst b/docs/testing/ecosystem/overview.rst
index 940e720ab..ffd4c597d 100644
--- a/docs/testing/ecosystem/overview.rst
+++ b/docs/testing/ecosystem/overview.rst
@@ -8,18 +8,20 @@ OPNFV testing
Introduction
============
-Testing is one of the key activities in OPNFV, including component level testing,
-system testing, automated deployment validation and performance characteristics
-or stress testing.
+Testing is one of the key activities in OPNFV and includes unit, feature, component, system
+level testing for development, automated deployment, performance characterization or stress
+testing.
-Some projects are fully dedicated to testing, they provide frameworks or tooling.
-The feature projects also include their own test suites.
-he test projects fulfill different roles (such as functional checks, performance
-measurement, platform and component benchmarks, and analysis) on the scenarios
-released in OPNFV.
+Test projects are dedicated to provide frameworks, tooling and test-cases catagorized as
+functional, performance or compliance testing. Test projects fulfill different roles such as
+verifying VIM functionality, benchmarking components and platforms or analysis of measured
+KPIs for the scenarios released in OPNFV.
-This document will detail the OPNFV testing ecosystem, describe the commons used
-by the projects and provide the links to project specific documentation.
+Feature projects also provide their own test suites that either run independently or within a
+test project.
+
+This document details the OPNFV testing ecosystem, describes test commonality used
+by the projects and provides links to project specific documentation.
OPNFV testing ecosystem
@@ -34,7 +36,7 @@ The OPNFV testing projects may be summarized as follows:
:align: center
:alt: Overview of OPNFV Testing projects
-The main projects of the testing projects are described in the table below:
+The major testing projects are described in the table below:
+----------------+---------------------------------------------------------+
| Project | Description |
@@ -46,8 +48,8 @@ The main projects of the testing projects are described in the table below:
| | production environment, an automatic method for |
| | executing benchmarks which plans to validate the |
| | deployment during staging is adopted. This project |
-| | provides a framework to find the bottlenecks of OPNFV |
-| | infrastructure. |
+| | forms a staging framework to find bottlenecks and to do |
+| | analysis of the OPNFV infrastructure. |
+----------------+---------------------------------------------------------+
| CPerf | SDN Controller benchmarks and performance testing, |
| | applicable to controllers in general. |
@@ -86,15 +88,13 @@ The main projects of the testing projects are described in the table below:
| | pass/fail thresholds for test, staging, and production |
| | NFVI environments. |
+----------------+---------------------------------------------------------+
-| VSperf | The Project “vSwitch Performance" develops a generic and|
-| | architecture agnostic vSwitch testing framework and |
-| | associated tests, that will serve as a basis for |
-| | validating the suitability of different vSwitch |
-| | implementations in a Telco NFV deployment environment. |
-| | The output of this project will be utilized by the OPNFV|
-| | Performance and Test group and its associated projects, |
-| | as part of OPNFV Platform and VNF level testing and |
-| | validation. |
+| VSperf | This project provides a framework for automation of NFV |
+| | data-plane performance testing and benchmarking. The |
+| | NFVI fast-path includes switch technology and network |
+| | with physical and virtual interfaces. Vsperf can be |
+| | used to evaluate the suitability of different Switch |
+| | implementations and features, quantify data-path |
+| | performance and optimize platform configurations. |
+----------------+---------------------------------------------------------+
| Yardstick | The goal of the Project is to verify the infrastructure |
| | compliance when running VNF applications. NFV Use Cases |