diff options
author | ChristopherPrice <christopher.price@ericsson.com> | 2016-02-01 16:58:24 +0100 |
---|---|---|
committer | Christopher Price <christopher.price@ericsson.com> | 2016-02-03 09:17:51 +0000 |
commit | f0e8daeff47cf716109945f277ba635f6c8e7a55 (patch) | |
tree | d03b7ec9c315e140f86f50f733370231bd5e16c3 /docs/configguide/post-install.rst | |
parent | ead63efa3372541918b3e8227db49482ccedde9b (diff) |
Adding new projects content and license information.
This includes content from a variety of projects participating in Brahmaputra.
We need to move to editorial work shortly, establishing a consistent style now that
we have sufficient content in place to work with.
Change-Id: I3a54358186ec788bf8cb60b2e44517c36ff53fa2
Signed-off-by: ChristopherPrice <christopher.price@ericsson.com>
Diffstat (limited to 'docs/configguide/post-install.rst')
-rw-r--r-- | docs/configguide/post-install.rst | 17 |
1 files changed, 15 insertions, 2 deletions
diff --git a/docs/configguide/post-install.rst b/docs/configguide/post-install.rst index 663080d2a..1a7c4ca53 100644 --- a/docs/configguide/post-install.rst +++ b/docs/configguide/post-install.rst @@ -1,9 +1,22 @@ +.. This work is licensed under a Creative Commons Attribution 4.0 International License. +.. http://creativecommons.org/licenses/by/4.0 +.. (c) Christopher Price (Ericsson AB) + ============================= Post Configuration Activities ============================= -This section describes the post configuration activitites that will allow you to validate the success -of your configuration. Further details may be found in the referred project specific documentation. +Once you have deployed and configured your scenario and features you should validate the +state of the system using the following guides. + +The following guides provide information on how to validate the installation of you scenario +based on the tools and test suites available for the installation tool you have selected: .. include:: ../projects/functest/configguide/configguide.rst .. include:: ../projects/joid/configguide/postinstall.rst + +The following sections provide information on how to validate the features you have +installed in your scenario: + +.. include:: ../projects/copper/configguide/postinstall.rst + |