diff --git a/docs/scenario-lifecycle/creating-scenarios.rst b/docs/scenario-lifecycle/creating-scenarios.rst
new file mode 100644
index 0000000..f445a00
--- /dev/null
+++ b/docs/scenario-lifecycle/creating-scenarios.rst
@@ -0,0 +1,96 @@
+.. This work is licensed under a Creative Commons Attribution 4.0 International License.
+.. http://creativecommons.org/licenses/by/4.0
+.. (c) 2017 OPNFV Ulrich Kleber (Huawei)
+
+
+Creating Scenarios
+--------------------
+
+Purpose
+^^^^^^^^^^^
+
+A new scenario needs to be created, when a new combination of upstream
+components or features shall be supported, that cannot be provided with the
+existing scenarios in parallel to their existing features.
+
+Typically new scenarios are created as children of existing scenarios.
+
+* In some cases an upstream implementation can be replaced by a different solution.
+ The most obvious example here is the SDN controller. In the first OPNFV release,
+ only ODL was supported. Later ONOS and OpenContrail were added, thus creating
+ new scenarios.
+
+ In most cases, only one of the SDN controllers is needed, thus OPNFV will support
+ the different SDN controllers by different scenarios. This support will be long-
+ term, so there will be multiple generic scenarios for these options.
+
+* Another usecase is feature incompatibilities. For instance, OVS and FD.io
+ cannot be combined today. Therefore we need different scenarios for them.
+ If it is expected that such an incompatibility is not solved for longer time,
+ there can be even separate generic scenarios for these options.
+
+The overlap between scenarios should only be allowed where they add components
+that cannot be integrated in a single deployment.
+
+If scenario A completely covers scenario B, support of scenario B will be
+only provided as long as isolation of development risks is necessary.
+However, there might be cases where somebody wants to use scenario B
+still as a parent for specific scenarios.
+
+This is especially the case for generic scenarios, since they need more CI and testing
+resources. Therefore a gating process will be introduced for generic scenarios.
+
+
+Creating Generic Scenarios
+^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
+
+Generic scenarios provide stable and mature deployments of an OPNFV release. Therefore
+it is important to have generic scenarios in place that provide the main capabilities
+needed for NFV environments. On the other hand the number of generic scenarios needs
+to be limited because of resources.
+
+* Creation of a new generic scenario needs TSC consensus.
+* Typically the generic scenario is created by promoting an existing specific
+ scenario. Thus the only the additional information needs to be provided.
+* The scenario owner needs to verify that the scenario fulfills the above requirements.
+* Since specific scenarios typically are owned by the project who have initiated it,
+ and generic scenarios provide a much broader set of features, in many cases a
+ change of owner is appropriate. In most cases it will be appropriate to assign
+ a testing expert as scenario owner.
+
+Creating Specific Scenarios
+^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
+
+As already stated, typically specific scenarios are created as children of existing
+scenarios. The parent can be a generic or a specific scenario.
+
+Creation of specific scenarios shall be very easy and can be done any time. However,
+support might be low priority during a final release preparation, e.g. after a MS6.
+
+* The PTL of the project developing the feature(s) or integrating a component etc can
+ request the scenario (tbd from whom: CI or release manager, no need for TSC)
+* The PTL shall provide some justification why a new scenario is needed.
+ It will be approptiate to discuss that justification in the weekly technical
+ discussion meeting.
+* The PTL should have prepared that by finding support from one of the installers.
+* The PTL should explain from which "parent scenario" (see below) the work will start,
+ and what are the planned additions.
+* The PTL shall assign a unique name. Naming rules will be set by TSC.
+* The PTL shall provide some time schedule plans when the scenario wants to join
+ a release, when he expects the scenario merge to other scenarios, and he expects
+ the features may be made available in generic scenarios.
+ A scenario can join a release at the MS0 after its creation.
+ It should join a release latest on the next MS0 6 month after its
+ creation (that is it should skip only one release) and merge to its parent
+ maximum 2 releases later.
+ .. Editors note: "2 releases" is rather strict maybe refine?
+* The PTL should explain the infrastructure requirements and clarify that sufficient
+ resources are available for the scenario.
+* The PTL shall assign a scenario owner.
+* The scenario owner shall maintain the scenario descriptor file according to the
+ template.
+* The scenario owner shall initiate the scenario be integrated in CI or releases.
+* When the scenario joins a release this needs to be done in time for the relevant
+ milestones.
+
+