Age | Commit message (Collapse) | Author | Files | Lines | |
---|---|---|---|---|---|
2016-07-15 | Add general, future-looking statement in Problem Description, Goals, | Bin Hu | 1 | -0/+9 | |
and Summary. Change-Id: I9b30ed7f6acc317f813259e8124e3e520504465b Signed-off-by: Bin Hu <bh526r@att.com> | |||||
2016-07-12 | Added stub for summary and conclusion section | Georg Kunz | 1 | -3/+12 | |
Added a basic introductory text for the summary and conlusion section. In this section, a summary of all gaps shall be given and corresponding conclusions shall be drawn. These conclusions shall state whether Neutron can/shall be extended or if some other networking framework is more suitable. Change-Id: I78c811bb7611beade2d436f34e672ff8424fcda4 Signed-off-by: Georg Kunz <georg.kunz@ericsson.com> | |||||
2016-04-19 | Add initial requirements document structure | Ildiko Vancsa | 1 | -0/+7 | |
Change-Id: I6ff02dd5181f30c555d9932b95fc0b7e692df733 Signed-off-by: Ildiko Vancsa <ildiko.vancsa@ericsson.com> |