summaryrefslogtreecommitdiffstats
path: root/docs/03-Functional_Requirements.rst
diff options
context:
space:
mode:
Diffstat (limited to 'docs/03-Functional_Requirements.rst')
-rw-r--r--docs/03-Functional_Requirements.rst240
1 files changed, 0 insertions, 240 deletions
diff --git a/docs/03-Functional_Requirements.rst b/docs/03-Functional_Requirements.rst
deleted file mode 100644
index c0695bb..0000000
--- a/docs/03-Functional_Requirements.rst
+++ /dev/null
@@ -1,240 +0,0 @@
-Functional Requirements
------------------------
-
-Basic Actions
-~~~~~~~~~~~~~
-
-This section describes the basic functions may required by Escalator.
-
-Preparation (offline)
-^^^^^^^^^^^^^^^^^^^^^
-
-This is the design phase when the upgrade plan (or upgrade campaign) is
-being designed so that it can be executed automatically with minimal
-service outage. It may include the following work:
-
-1. Check the dependencies of the software modules and their impact,
- backward compatibilities to figure out the appropriate upgrade method
- and ordering.
-2. Find out if a rolling upgrade could be planned with several rolling
- steps to avoid any service outage due to the upgrade some
- parts/services at the same time.
-3. Collect the proper version files and check the integration for
- upgrading.
-4. The preparation step should produce an output (i.e. upgrade
- campaign/plan), which is executable automatically in an NFV Framework
- and which can be validated before execution.
-
- - The upgrade campaign should not be referring to scalable entities
- directly, but allow for adaptation to the system configuration and
- state at any given moment.
- - The upgrade campaign should describe the ordering of the upgrade
- of different entities so that dependencies, redundancies can be
- maintained during the upgrade execution
- - The upgrade campaign should provide information about the
- applicable recovery procedures and their ordering.
- - The upgrade campaign should consider information about the
- verification/testing procedures to be performed during the upgrade
- so that upgrade failures can be detected as soon as possible and
- the appropriate recovery procedure can be identified and applied.
- - The upgrade campaign should provide information on the expected
- execution time so that hanging execution can be identified
- - The upgrade campaign should indicate any point in the upgrade when
- coordination with the users (VNFs) is required.
-
-.. <hujie> Depends on the attributes of the object being upgraded, the
- upgrade plan may be slitted into step(s) and/or sub-plan(s), and even
- more small sub-plans in design phase. The plan(s) or sub-plan(s) my
- include step(s) or sub-plan(s).
-
-Validation the upgrade plan / Checking the pre-requisites of System( offline / online)
-^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
-
-The upgrade plan should be validated before the execution by testing
-it in a test environment which is similar to the product environment.
-
-.. <MT> However it could also mean that we can identify some properties
- that it should satisfy e.g. what operations can or cannot be executed
- simultaneously like never take out two VMs of the same VNF.
-
-.. <MT> Another question is if it requires that the system is in a particular
- state when the upgrade is applied. I.e. if there's certain amount of
- redundancy in the system, migration is enabled for VMs, when the NFVI
- is upgraded the VIM is healthy, when the VIM is upgraded the NFVI is
- healthy, etc.
-
-.. <MT> I'm not sure what online validation means: Is it the validation of the
- upgrade plan/campaign or the validation of the system that it is in a
- state that the upgrade can be performed without too much risk?==
-
-Before the upgrade plan being executed, the system healthy of the
-online product environment should be checked and confirmed to satisfy
-the requirements which were described in the upgrade plan. The
-sysinfo, e.g. which included system alarms, performance statistics and
-diagnostic logs, will be collected and analogized. It is required to
-resolve all of the system faults or exclude the unhealthy part before
-executing the upgrade plan.
-
-
-Backup/Snapshot (online)
-^^^^^^^^^^^^^^^^^^^^^^^^
-
-For avoid loss of data when a unsuccessful upgrade was encountered, the
-data should be back-upped and the system state snapshot should be taken
-before the execution of upgrade plan. This would be considered in the
-upgrade plan.
-
-Several backups/Snapshots may be generated and stored before the single
-steps of changes. The following data/files are required to be
-considered:
-
-1. running version files for each node.
-2. system components' configuration file and database.
-3. image and storage, if it is necessary.
-
-.. <MT> Does 3 imply VNF image and storage? I.e. VNF state and data?==
-
-.. <hujie> The following text is derived from previous "4. Negotiate
- with the VNF if it's ready for the upgrade"
-
-Although the upper layer, which include VNFs and VNFMs, is out of the
-scope of Escalator, but it is still recommended to let it ready for a
-smooth system upgrade. The escalator could not guarantee the safe of
-VNFs. The upper layer should have some safe guard mechanism in design,
-and ready for avoiding failure in system upgrade.
-
-Execution (online)
-^^^^^^^^^^^^^^^^^^
-
-The execution of upgrade plan should be a dynamical procedure which is
- controlled by Escalator.
-
-.. <hujie> Revised text to be general.==
-
-1. It is required to supporting execution ether in sequence or in
- parallel.
-2. It is required to check the result of the execution and take the
- action according the situation and the policies in the upgrade plan.
-3. It is required to execute properly on various configurations of
- system object. I.e. stand-alone, HA, etc.
-4. It is required to execute on the designated different parts of the
- system. I.e. physical server, virtualized server, rack, chassis,
- cluster, even different geographical places.
-
-Testing (online)
-^^^^^^^^^^^^^^^^
-
-The testing after upgrade the whole system or parts of system to make
-sure the upgraded system(object) is working normally.
-
-.. <hujie> Revised text to be general.
-
-1. It is recommended to run the prepared test cases to see if the
- functionalities are available without any problem.
-2. It is recommended to check the sysinfo, e.g. system alarms,
- performance statistics and diagnostic logs to see if there are any
- abnormal.
-
-Restore/Roll-back (online)
-^^^^^^^^^^^^^^^^^^^^^^^^^^
-
-When upgrade is failure unfortunately, a quick system restore or system
-roll-back should be taken to recovery the system and the services.
-
-.. <hujie> Revised text to be general.
-
-1. It is recommend to support system restore from backup when upgrade
- was failed.
-2. It is recommend to support graceful roll-back with reverse order
- steps if possible.
-
-Monitoring (online)
-^^^^^^^^^^^^^^^^^^^
-
-Escalator should continually monitor the process of upgrade. It is
-keeping update status of each module, each node, each cluster into a
-status table during upgrade.
-
-.. <hujie> Revised text to be general.
-
-1. It is required to collect the status of every objects being upgraded
- and sending abnormal alarms during the upgrade.
-2. It is recommend to reuse the existing monitoring system, like alarm.
-3. It is recommend to support pro-actively query.
-4. It is recommend to support passively wait for notification.
-
-**Two possible ways for monitoring:**
-
-**Pro-Actively Query** requires NFVI/VIM provides proper API or CLI
-interface. If Escalator serves as a service, it should pass on these
-interfaces.
-
-**Passively Wait for Notification** requires Escalator provides
-callback interface, which could be used by NFVI/VIM systems or upgrade
-agent to send back notification.
-
-.. <hujie> I am not sure why not to subscribe the notification.
-
-Logging (online)
-^^^^^^^^^^^^^^^^
-
-Record the information generated by escalator into log files. The log
-file is used for manual diagnostic of exceptions.
-
-1. It is required to support logging.
-2. It is recommended to include time stamp, object id, action name,
- error code, etc.
-
-Administrative Control (online)
-^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
-
-Administrative Control is used for control the privilege to start any
-escalator's actions for avoiding unauthorized operations.
-
-#. It is required to support administrative control mechanism
-#. It is recommend to reuse the system's own secure system.
-#. It is required to avoid conflicts when the system's own secure system
- being upgraded.
-
-Requirements on Object being upgraded
-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
-
-.. <hujie> We can develop BPs in future from requirements of this section and
- gap analysis for upper stream projects
-
-Escalator focus on smooth upgrade. In practical implementation, it
-might be combined with installer/deplorer, or act as an independent
-tool/service. In either way, it requires targeting systems(NFVI and
-VIM) are developed/deployed in a way that Escalator could perform
-upgrade on them.
-
-On NFVI system, live-migration is likely used to maintain availability
-because OPNFV would like to make HA transparent from end user. This
-requires VIM system being able to put compute node into maintenance mode
-and then isolated from normal service. Otherwise, new NFVI instances
-might risk at being schedule into the upgrading node.
-
-On VIM system, availability is likely achieved by redundancy. This
-impose less requirements on system/services being upgrade (see PVA
-comments in early version). However, there should be a way to put the
-target system into standby mode. Because starting upgrade on the
-master node in a cluster is likely a bad idea.
-
-.. <hujie>Revised text to be general.
-
-1. It is required for NFVI/VIM to support **service handover** mechanism
- that minimize interruption to 0.001%(i.e. 99.999% service
- availability). Possible implementations are live-migration, redundant
- deployment, etc, (Note: for VIM, interruption could be less
- restrictive)
-
-2. It is required for NFVI/VIM to restore the early version in a efficient
- way, such as **snapshot**.
-
-3. It is required for NFVI/VIM to **migration data** efficiently between
- base and upgraded system.
-
-4. It is recommend for NFV/VIM's interface to support upgrade
- orchestration, e.g. reading/setting system state.
-
-