summaryrefslogtreecommitdiffstats
path: root/docs/03-Functional_Requirements.rst
diff options
context:
space:
mode:
Diffstat (limited to 'docs/03-Functional_Requirements.rst')
-rw-r--r--docs/03-Functional_Requirements.rst240
1 files changed, 240 insertions, 0 deletions
diff --git a/docs/03-Functional_Requirements.rst b/docs/03-Functional_Requirements.rst
new file mode 100644
index 0000000..c0695bb
--- /dev/null
+++ b/docs/03-Functional_Requirements.rst
@@ -0,0 +1,240 @@
+Functional Requirements
+-----------------------
+
+Basic Actions
+~~~~~~~~~~~~~
+
+This section describes the basic functions may required by Escalator.
+
+Preparation (offline)
+^^^^^^^^^^^^^^^^^^^^^
+
+This is the design phase when the upgrade plan (or upgrade campaign) is
+being designed so that it can be executed automatically with minimal
+service outage. It may include the following work:
+
+1. Check the dependencies of the software modules and their impact,
+ backward compatibilities to figure out the appropriate upgrade method
+ and ordering.
+2. Find out if a rolling upgrade could be planned with several rolling
+ steps to avoid any service outage due to the upgrade some
+ parts/services at the same time.
+3. Collect the proper version files and check the integration for
+ upgrading.
+4. The preparation step should produce an output (i.e. upgrade
+ campaign/plan), which is executable automatically in an NFV Framework
+ and which can be validated before execution.
+
+ - The upgrade campaign should not be referring to scalable entities
+ directly, but allow for adaptation to the system configuration and
+ state at any given moment.
+ - The upgrade campaign should describe the ordering of the upgrade
+ of different entities so that dependencies, redundancies can be
+ maintained during the upgrade execution
+ - The upgrade campaign should provide information about the
+ applicable recovery procedures and their ordering.
+ - The upgrade campaign should consider information about the
+ verification/testing procedures to be performed during the upgrade
+ so that upgrade failures can be detected as soon as possible and
+ the appropriate recovery procedure can be identified and applied.
+ - The upgrade campaign should provide information on the expected
+ execution time so that hanging execution can be identified
+ - The upgrade campaign should indicate any point in the upgrade when
+ coordination with the users (VNFs) is required.
+
+.. <hujie> Depends on the attributes of the object being upgraded, the
+ upgrade plan may be slitted into step(s) and/or sub-plan(s), and even
+ more small sub-plans in design phase. The plan(s) or sub-plan(s) my
+ include step(s) or sub-plan(s).
+
+Validation the upgrade plan / Checking the pre-requisites of System( offline / online)
+^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
+
+The upgrade plan should be validated before the execution by testing
+it in a test environment which is similar to the product environment.
+
+.. <MT> However it could also mean that we can identify some properties
+ that it should satisfy e.g. what operations can or cannot be executed
+ simultaneously like never take out two VMs of the same VNF.
+
+.. <MT> Another question is if it requires that the system is in a particular
+ state when the upgrade is applied. I.e. if there's certain amount of
+ redundancy in the system, migration is enabled for VMs, when the NFVI
+ is upgraded the VIM is healthy, when the VIM is upgraded the NFVI is
+ healthy, etc.
+
+.. <MT> I'm not sure what online validation means: Is it the validation of the
+ upgrade plan/campaign or the validation of the system that it is in a
+ state that the upgrade can be performed without too much risk?==
+
+Before the upgrade plan being executed, the system healthy of the
+online product environment should be checked and confirmed to satisfy
+the requirements which were described in the upgrade plan. The
+sysinfo, e.g. which included system alarms, performance statistics and
+diagnostic logs, will be collected and analogized. It is required to
+resolve all of the system faults or exclude the unhealthy part before
+executing the upgrade plan.
+
+
+Backup/Snapshot (online)
+^^^^^^^^^^^^^^^^^^^^^^^^
+
+For avoid loss of data when a unsuccessful upgrade was encountered, the
+data should be back-upped and the system state snapshot should be taken
+before the execution of upgrade plan. This would be considered in the
+upgrade plan.
+
+Several backups/Snapshots may be generated and stored before the single
+steps of changes. The following data/files are required to be
+considered:
+
+1. running version files for each node.
+2. system components' configuration file and database.
+3. image and storage, if it is necessary.
+
+.. <MT> Does 3 imply VNF image and storage? I.e. VNF state and data?==
+
+.. <hujie> The following text is derived from previous "4. Negotiate
+ with the VNF if it's ready for the upgrade"
+
+Although the upper layer, which include VNFs and VNFMs, is out of the
+scope of Escalator, but it is still recommended to let it ready for a
+smooth system upgrade. The escalator could not guarantee the safe of
+VNFs. The upper layer should have some safe guard mechanism in design,
+and ready for avoiding failure in system upgrade.
+
+Execution (online)
+^^^^^^^^^^^^^^^^^^
+
+The execution of upgrade plan should be a dynamical procedure which is
+ controlled by Escalator.
+
+.. <hujie> Revised text to be general.==
+
+1. It is required to supporting execution ether in sequence or in
+ parallel.
+2. It is required to check the result of the execution and take the
+ action according the situation and the policies in the upgrade plan.
+3. It is required to execute properly on various configurations of
+ system object. I.e. stand-alone, HA, etc.
+4. It is required to execute on the designated different parts of the
+ system. I.e. physical server, virtualized server, rack, chassis,
+ cluster, even different geographical places.
+
+Testing (online)
+^^^^^^^^^^^^^^^^
+
+The testing after upgrade the whole system or parts of system to make
+sure the upgraded system(object) is working normally.
+
+.. <hujie> Revised text to be general.
+
+1. It is recommended to run the prepared test cases to see if the
+ functionalities are available without any problem.
+2. It is recommended to check the sysinfo, e.g. system alarms,
+ performance statistics and diagnostic logs to see if there are any
+ abnormal.
+
+Restore/Roll-back (online)
+^^^^^^^^^^^^^^^^^^^^^^^^^^
+
+When upgrade is failure unfortunately, a quick system restore or system
+roll-back should be taken to recovery the system and the services.
+
+.. <hujie> Revised text to be general.
+
+1. It is recommend to support system restore from backup when upgrade
+ was failed.
+2. It is recommend to support graceful roll-back with reverse order
+ steps if possible.
+
+Monitoring (online)
+^^^^^^^^^^^^^^^^^^^
+
+Escalator should continually monitor the process of upgrade. It is
+keeping update status of each module, each node, each cluster into a
+status table during upgrade.
+
+.. <hujie> Revised text to be general.
+
+1. It is required to collect the status of every objects being upgraded
+ and sending abnormal alarms during the upgrade.
+2. It is recommend to reuse the existing monitoring system, like alarm.
+3. It is recommend to support pro-actively query.
+4. It is recommend to support passively wait for notification.
+
+**Two possible ways for monitoring:**
+
+**Pro-Actively Query** requires NFVI/VIM provides proper API or CLI
+interface. If Escalator serves as a service, it should pass on these
+interfaces.
+
+**Passively Wait for Notification** requires Escalator provides
+callback interface, which could be used by NFVI/VIM systems or upgrade
+agent to send back notification.
+
+.. <hujie> I am not sure why not to subscribe the notification.
+
+Logging (online)
+^^^^^^^^^^^^^^^^
+
+Record the information generated by escalator into log files. The log
+file is used for manual diagnostic of exceptions.
+
+1. It is required to support logging.
+2. It is recommended to include time stamp, object id, action name,
+ error code, etc.
+
+Administrative Control (online)
+^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
+
+Administrative Control is used for control the privilege to start any
+escalator's actions for avoiding unauthorized operations.
+
+#. It is required to support administrative control mechanism
+#. It is recommend to reuse the system's own secure system.
+#. It is required to avoid conflicts when the system's own secure system
+ being upgraded.
+
+Requirements on Object being upgraded
+~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
+
+.. <hujie> We can develop BPs in future from requirements of this section and
+ gap analysis for upper stream projects
+
+Escalator focus on smooth upgrade. In practical implementation, it
+might be combined with installer/deplorer, or act as an independent
+tool/service. In either way, it requires targeting systems(NFVI and
+VIM) are developed/deployed in a way that Escalator could perform
+upgrade on them.
+
+On NFVI system, live-migration is likely used to maintain availability
+because OPNFV would like to make HA transparent from end user. This
+requires VIM system being able to put compute node into maintenance mode
+and then isolated from normal service. Otherwise, new NFVI instances
+might risk at being schedule into the upgrading node.
+
+On VIM system, availability is likely achieved by redundancy. This
+impose less requirements on system/services being upgrade (see PVA
+comments in early version). However, there should be a way to put the
+target system into standby mode. Because starting upgrade on the
+master node in a cluster is likely a bad idea.
+
+.. <hujie>Revised text to be general.
+
+1. It is required for NFVI/VIM to support **service handover** mechanism
+ that minimize interruption to 0.001%(i.e. 99.999% service
+ availability). Possible implementations are live-migration, redundant
+ deployment, etc, (Note: for VIM, interruption could be less
+ restrictive)
+
+2. It is required for NFVI/VIM to restore the early version in a efficient
+ way, such as **snapshot**.
+
+3. It is required for NFVI/VIM to **migration data** efficiently between
+ base and upgraded system.
+
+4. It is recommend for NFV/VIM's interface to support upgrade
+ orchestration, e.g. reading/setting system state.
+
+