diff options
Diffstat (limited to 'doc/03-Functional_Requirements.rst')
-rw-r--r-- | doc/03-Functional_Requirements.rst | 240 |
1 files changed, 240 insertions, 0 deletions
diff --git a/doc/03-Functional_Requirements.rst b/doc/03-Functional_Requirements.rst new file mode 100644 index 0000000..c0695bb --- /dev/null +++ b/doc/03-Functional_Requirements.rst @@ -0,0 +1,240 @@ +Functional Requirements +----------------------- + +Basic Actions +~~~~~~~~~~~~~ + +This section describes the basic functions may required by Escalator. + +Preparation (offline) +^^^^^^^^^^^^^^^^^^^^^ + +This is the design phase when the upgrade plan (or upgrade campaign) is +being designed so that it can be executed automatically with minimal +service outage. It may include the following work: + +1. Check the dependencies of the software modules and their impact, + backward compatibilities to figure out the appropriate upgrade method + and ordering. +2. Find out if a rolling upgrade could be planned with several rolling + steps to avoid any service outage due to the upgrade some + parts/services at the same time. +3. Collect the proper version files and check the integration for + upgrading. +4. The preparation step should produce an output (i.e. upgrade + campaign/plan), which is executable automatically in an NFV Framework + and which can be validated before execution. + + - The upgrade campaign should not be referring to scalable entities + directly, but allow for adaptation to the system configuration and + state at any given moment. + - The upgrade campaign should describe the ordering of the upgrade + of different entities so that dependencies, redundancies can be + maintained during the upgrade execution + - The upgrade campaign should provide information about the + applicable recovery procedures and their ordering. + - The upgrade campaign should consider information about the + verification/testing procedures to be performed during the upgrade + so that upgrade failures can be detected as soon as possible and + the appropriate recovery procedure can be identified and applied. + - The upgrade campaign should provide information on the expected + execution time so that hanging execution can be identified + - The upgrade campaign should indicate any point in the upgrade when + coordination with the users (VNFs) is required. + +.. <hujie> Depends on the attributes of the object being upgraded, the + upgrade plan may be slitted into step(s) and/or sub-plan(s), and even + more small sub-plans in design phase. The plan(s) or sub-plan(s) my + include step(s) or sub-plan(s). + +Validation the upgrade plan / Checking the pre-requisites of System( offline / online) +^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ + +The upgrade plan should be validated before the execution by testing +it in a test environment which is similar to the product environment. + +.. <MT> However it could also mean that we can identify some properties + that it should satisfy e.g. what operations can or cannot be executed + simultaneously like never take out two VMs of the same VNF. + +.. <MT> Another question is if it requires that the system is in a particular + state when the upgrade is applied. I.e. if there's certain amount of + redundancy in the system, migration is enabled for VMs, when the NFVI + is upgraded the VIM is healthy, when the VIM is upgraded the NFVI is + healthy, etc. + +.. <MT> I'm not sure what online validation means: Is it the validation of the + upgrade plan/campaign or the validation of the system that it is in a + state that the upgrade can be performed without too much risk?== + +Before the upgrade plan being executed, the system healthy of the +online product environment should be checked and confirmed to satisfy +the requirements which were described in the upgrade plan. The +sysinfo, e.g. which included system alarms, performance statistics and +diagnostic logs, will be collected and analogized. It is required to +resolve all of the system faults or exclude the unhealthy part before +executing the upgrade plan. + + +Backup/Snapshot (online) +^^^^^^^^^^^^^^^^^^^^^^^^ + +For avoid loss of data when a unsuccessful upgrade was encountered, the +data should be back-upped and the system state snapshot should be taken +before the execution of upgrade plan. This would be considered in the +upgrade plan. + +Several backups/Snapshots may be generated and stored before the single +steps of changes. The following data/files are required to be +considered: + +1. running version files for each node. +2. system components' configuration file and database. +3. image and storage, if it is necessary. + +.. <MT> Does 3 imply VNF image and storage? I.e. VNF state and data?== + +.. <hujie> The following text is derived from previous "4. Negotiate + with the VNF if it's ready for the upgrade" + +Although the upper layer, which include VNFs and VNFMs, is out of the +scope of Escalator, but it is still recommended to let it ready for a +smooth system upgrade. The escalator could not guarantee the safe of +VNFs. The upper layer should have some safe guard mechanism in design, +and ready for avoiding failure in system upgrade. + +Execution (online) +^^^^^^^^^^^^^^^^^^ + +The execution of upgrade plan should be a dynamical procedure which is + controlled by Escalator. + +.. <hujie> Revised text to be general.== + +1. It is required to supporting execution ether in sequence or in + parallel. +2. It is required to check the result of the execution and take the + action according the situation and the policies in the upgrade plan. +3. It is required to execute properly on various configurations of + system object. I.e. stand-alone, HA, etc. +4. It is required to execute on the designated different parts of the + system. I.e. physical server, virtualized server, rack, chassis, + cluster, even different geographical places. + +Testing (online) +^^^^^^^^^^^^^^^^ + +The testing after upgrade the whole system or parts of system to make +sure the upgraded system(object) is working normally. + +.. <hujie> Revised text to be general. + +1. It is recommended to run the prepared test cases to see if the + functionalities are available without any problem. +2. It is recommended to check the sysinfo, e.g. system alarms, + performance statistics and diagnostic logs to see if there are any + abnormal. + +Restore/Roll-back (online) +^^^^^^^^^^^^^^^^^^^^^^^^^^ + +When upgrade is failure unfortunately, a quick system restore or system +roll-back should be taken to recovery the system and the services. + +.. <hujie> Revised text to be general. + +1. It is recommend to support system restore from backup when upgrade + was failed. +2. It is recommend to support graceful roll-back with reverse order + steps if possible. + +Monitoring (online) +^^^^^^^^^^^^^^^^^^^ + +Escalator should continually monitor the process of upgrade. It is +keeping update status of each module, each node, each cluster into a +status table during upgrade. + +.. <hujie> Revised text to be general. + +1. It is required to collect the status of every objects being upgraded + and sending abnormal alarms during the upgrade. +2. It is recommend to reuse the existing monitoring system, like alarm. +3. It is recommend to support pro-actively query. +4. It is recommend to support passively wait for notification. + +**Two possible ways for monitoring:** + +**Pro-Actively Query** requires NFVI/VIM provides proper API or CLI +interface. If Escalator serves as a service, it should pass on these +interfaces. + +**Passively Wait for Notification** requires Escalator provides +callback interface, which could be used by NFVI/VIM systems or upgrade +agent to send back notification. + +.. <hujie> I am not sure why not to subscribe the notification. + +Logging (online) +^^^^^^^^^^^^^^^^ + +Record the information generated by escalator into log files. The log +file is used for manual diagnostic of exceptions. + +1. It is required to support logging. +2. It is recommended to include time stamp, object id, action name, + error code, etc. + +Administrative Control (online) +^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ + +Administrative Control is used for control the privilege to start any +escalator's actions for avoiding unauthorized operations. + +#. It is required to support administrative control mechanism +#. It is recommend to reuse the system's own secure system. +#. It is required to avoid conflicts when the system's own secure system + being upgraded. + +Requirements on Object being upgraded +~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ + +.. <hujie> We can develop BPs in future from requirements of this section and + gap analysis for upper stream projects + +Escalator focus on smooth upgrade. In practical implementation, it +might be combined with installer/deplorer, or act as an independent +tool/service. In either way, it requires targeting systems(NFVI and +VIM) are developed/deployed in a way that Escalator could perform +upgrade on them. + +On NFVI system, live-migration is likely used to maintain availability +because OPNFV would like to make HA transparent from end user. This +requires VIM system being able to put compute node into maintenance mode +and then isolated from normal service. Otherwise, new NFVI instances +might risk at being schedule into the upgrading node. + +On VIM system, availability is likely achieved by redundancy. This +impose less requirements on system/services being upgrade (see PVA +comments in early version). However, there should be a way to put the +target system into standby mode. Because starting upgrade on the +master node in a cluster is likely a bad idea. + +.. <hujie>Revised text to be general. + +1. It is required for NFVI/VIM to support **service handover** mechanism + that minimize interruption to 0.001%(i.e. 99.999% service + availability). Possible implementations are live-migration, redundant + deployment, etc, (Note: for VIM, interruption could be less + restrictive) + +2. It is required for NFVI/VIM to restore the early version in a efficient + way, such as **snapshot**. + +3. It is required for NFVI/VIM to **migration data** efficiently between + base and upgraded system. + +4. It is recommend for NFV/VIM's interface to support upgrade + orchestration, e.g. reading/setting system state. + + |