diff options
Diffstat (limited to 'doc/03-Functional_Requirements.rst')
-rw-r--r-- | doc/03-Functional_Requirements.rst | 240 |
1 files changed, 0 insertions, 240 deletions
diff --git a/doc/03-Functional_Requirements.rst b/doc/03-Functional_Requirements.rst deleted file mode 100644 index c0695bb..0000000 --- a/doc/03-Functional_Requirements.rst +++ /dev/null @@ -1,240 +0,0 @@ -Functional Requirements ------------------------ - -Basic Actions -~~~~~~~~~~~~~ - -This section describes the basic functions may required by Escalator. - -Preparation (offline) -^^^^^^^^^^^^^^^^^^^^^ - -This is the design phase when the upgrade plan (or upgrade campaign) is -being designed so that it can be executed automatically with minimal -service outage. It may include the following work: - -1. Check the dependencies of the software modules and their impact, - backward compatibilities to figure out the appropriate upgrade method - and ordering. -2. Find out if a rolling upgrade could be planned with several rolling - steps to avoid any service outage due to the upgrade some - parts/services at the same time. -3. Collect the proper version files and check the integration for - upgrading. -4. The preparation step should produce an output (i.e. upgrade - campaign/plan), which is executable automatically in an NFV Framework - and which can be validated before execution. - - - The upgrade campaign should not be referring to scalable entities - directly, but allow for adaptation to the system configuration and - state at any given moment. - - The upgrade campaign should describe the ordering of the upgrade - of different entities so that dependencies, redundancies can be - maintained during the upgrade execution - - The upgrade campaign should provide information about the - applicable recovery procedures and their ordering. - - The upgrade campaign should consider information about the - verification/testing procedures to be performed during the upgrade - so that upgrade failures can be detected as soon as possible and - the appropriate recovery procedure can be identified and applied. - - The upgrade campaign should provide information on the expected - execution time so that hanging execution can be identified - - The upgrade campaign should indicate any point in the upgrade when - coordination with the users (VNFs) is required. - -.. <hujie> Depends on the attributes of the object being upgraded, the - upgrade plan may be slitted into step(s) and/or sub-plan(s), and even - more small sub-plans in design phase. The plan(s) or sub-plan(s) my - include step(s) or sub-plan(s). - -Validation the upgrade plan / Checking the pre-requisites of System( offline / online) -^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ - -The upgrade plan should be validated before the execution by testing -it in a test environment which is similar to the product environment. - -.. <MT> However it could also mean that we can identify some properties - that it should satisfy e.g. what operations can or cannot be executed - simultaneously like never take out two VMs of the same VNF. - -.. <MT> Another question is if it requires that the system is in a particular - state when the upgrade is applied. I.e. if there's certain amount of - redundancy in the system, migration is enabled for VMs, when the NFVI - is upgraded the VIM is healthy, when the VIM is upgraded the NFVI is - healthy, etc. - -.. <MT> I'm not sure what online validation means: Is it the validation of the - upgrade plan/campaign or the validation of the system that it is in a - state that the upgrade can be performed without too much risk?== - -Before the upgrade plan being executed, the system healthy of the -online product environment should be checked and confirmed to satisfy -the requirements which were described in the upgrade plan. The -sysinfo, e.g. which included system alarms, performance statistics and -diagnostic logs, will be collected and analogized. It is required to -resolve all of the system faults or exclude the unhealthy part before -executing the upgrade plan. - - -Backup/Snapshot (online) -^^^^^^^^^^^^^^^^^^^^^^^^ - -For avoid loss of data when a unsuccessful upgrade was encountered, the -data should be back-upped and the system state snapshot should be taken -before the execution of upgrade plan. This would be considered in the -upgrade plan. - -Several backups/Snapshots may be generated and stored before the single -steps of changes. The following data/files are required to be -considered: - -1. running version files for each node. -2. system components' configuration file and database. -3. image and storage, if it is necessary. - -.. <MT> Does 3 imply VNF image and storage? I.e. VNF state and data?== - -.. <hujie> The following text is derived from previous "4. Negotiate - with the VNF if it's ready for the upgrade" - -Although the upper layer, which include VNFs and VNFMs, is out of the -scope of Escalator, but it is still recommended to let it ready for a -smooth system upgrade. The escalator could not guarantee the safe of -VNFs. The upper layer should have some safe guard mechanism in design, -and ready for avoiding failure in system upgrade. - -Execution (online) -^^^^^^^^^^^^^^^^^^ - -The execution of upgrade plan should be a dynamical procedure which is - controlled by Escalator. - -.. <hujie> Revised text to be general.== - -1. It is required to supporting execution ether in sequence or in - parallel. -2. It is required to check the result of the execution and take the - action according the situation and the policies in the upgrade plan. -3. It is required to execute properly on various configurations of - system object. I.e. stand-alone, HA, etc. -4. It is required to execute on the designated different parts of the - system. I.e. physical server, virtualized server, rack, chassis, - cluster, even different geographical places. - -Testing (online) -^^^^^^^^^^^^^^^^ - -The testing after upgrade the whole system or parts of system to make -sure the upgraded system(object) is working normally. - -.. <hujie> Revised text to be general. - -1. It is recommended to run the prepared test cases to see if the - functionalities are available without any problem. -2. It is recommended to check the sysinfo, e.g. system alarms, - performance statistics and diagnostic logs to see if there are any - abnormal. - -Restore/Roll-back (online) -^^^^^^^^^^^^^^^^^^^^^^^^^^ - -When upgrade is failure unfortunately, a quick system restore or system -roll-back should be taken to recovery the system and the services. - -.. <hujie> Revised text to be general. - -1. It is recommend to support system restore from backup when upgrade - was failed. -2. It is recommend to support graceful roll-back with reverse order - steps if possible. - -Monitoring (online) -^^^^^^^^^^^^^^^^^^^ - -Escalator should continually monitor the process of upgrade. It is -keeping update status of each module, each node, each cluster into a -status table during upgrade. - -.. <hujie> Revised text to be general. - -1. It is required to collect the status of every objects being upgraded - and sending abnormal alarms during the upgrade. -2. It is recommend to reuse the existing monitoring system, like alarm. -3. It is recommend to support pro-actively query. -4. It is recommend to support passively wait for notification. - -**Two possible ways for monitoring:** - -**Pro-Actively Query** requires NFVI/VIM provides proper API or CLI -interface. If Escalator serves as a service, it should pass on these -interfaces. - -**Passively Wait for Notification** requires Escalator provides -callback interface, which could be used by NFVI/VIM systems or upgrade -agent to send back notification. - -.. <hujie> I am not sure why not to subscribe the notification. - -Logging (online) -^^^^^^^^^^^^^^^^ - -Record the information generated by escalator into log files. The log -file is used for manual diagnostic of exceptions. - -1. It is required to support logging. -2. It is recommended to include time stamp, object id, action name, - error code, etc. - -Administrative Control (online) -^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ - -Administrative Control is used for control the privilege to start any -escalator's actions for avoiding unauthorized operations. - -#. It is required to support administrative control mechanism -#. It is recommend to reuse the system's own secure system. -#. It is required to avoid conflicts when the system's own secure system - being upgraded. - -Requirements on Object being upgraded -~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ - -.. <hujie> We can develop BPs in future from requirements of this section and - gap analysis for upper stream projects - -Escalator focus on smooth upgrade. In practical implementation, it -might be combined with installer/deplorer, or act as an independent -tool/service. In either way, it requires targeting systems(NFVI and -VIM) are developed/deployed in a way that Escalator could perform -upgrade on them. - -On NFVI system, live-migration is likely used to maintain availability -because OPNFV would like to make HA transparent from end user. This -requires VIM system being able to put compute node into maintenance mode -and then isolated from normal service. Otherwise, new NFVI instances -might risk at being schedule into the upgrading node. - -On VIM system, availability is likely achieved by redundancy. This -impose less requirements on system/services being upgrade (see PVA -comments in early version). However, there should be a way to put the -target system into standby mode. Because starting upgrade on the -master node in a cluster is likely a bad idea. - -.. <hujie>Revised text to be general. - -1. It is required for NFVI/VIM to support **service handover** mechanism - that minimize interruption to 0.001%(i.e. 99.999% service - availability). Possible implementations are live-migration, redundant - deployment, etc, (Note: for VIM, interruption could be less - restrictive) - -2. It is required for NFVI/VIM to restore the early version in a efficient - way, such as **snapshot**. - -3. It is required for NFVI/VIM to **migration data** efficiently between - base and upgraded system. - -4. It is recommend for NFV/VIM's interface to support upgrade - orchestration, e.g. reading/setting system state. - - |