Age | Commit message (Collapse) | Author | Files | Lines |
|
JIRA: HA-21
Signed-off-by: fuqiao@chinamobile.com
|
|
Upload images for the scenario analysis doc
JIRA: HA-18
|
|
Reorganize and reupload the seperate sections for the Scenario Analysis
doc
JIRA: HA-18
|
|
Merge all seperate sections and upload a complete .rst file for the
release.
JIRA: HA-18
|
|
Merge all seperate sections and upload a complete .rst file for the
release
JIRA: HA-1
|
|
Merge all seperate sections and upload a complete .rst file for the
release
JIRA:HA-1
|
|
NFV"
|
|
Merge all seperate sections and upload a complete rst and pdf file
JIRA: HA-1
|
|
Will upload the seperate sections in the next patch.
JIRA:HA-1
|
|
|
|
Merge all the seperate sections, and generate a complete doc for the B
release
Change-Id: I74523ccc3231151935479dd9e41224bc9c142d12
JIRA: HA-1
|
|
|
|
Merge all seperate sections and upload a complete rst file
JIRA:HA-10
Change-Id: I3054e3f9b0caf946cc3cc83a9244c5050a4f58fc
|
|
|
|
Merge all seperate sections together and generate a complete rst file.
Change-Id: I8ff509a3f2c47f1cf9788c4b3498eef1ebb24b5d
JIRA: HA-1
|
|
* changes:
Scenario Analysis Doc - Section 3 - communication Interfaces HA scheme
Scenario Analysis doc - multisite scenario
cenario analysis doc - general issues for VNF HA
Scenario Analysis doc - multisite scenario
Scenario analysis doc - general issues for VNF HA
Scenario Analysis doc - multisite scenario
|
|
comments. Including new pictures."
|
|
Section 3 - communication interfaces of VNF HA schemes
JIRA: HA 15
Change-Id: I1fd9a83fd3fdd985cf6d23685502c6a5df3877ed
|
|
Scenario Analysis doc - multisite Scenario
JIRA:HA-18
:
Change-Id: I3df017ec31325afab8dfde7d56bbb013d460acbb
|
|
JIRA: HA-16
Change-Id: I1c44ce114522b9af95ce056856f0e36c729e0722
Signed-off-by: Yifei Xue <xueyifei@huawei.com>
|
|
Add line wrap
Updated per review comments.
Including new pictures.
Change-Id: Ib7a23111a6daba300b6e6afca47a44c99c8dbf65
|
|
Scenario Analysis doc - general issues for VNF HA
JIRA:HA 15
Change-Id: Iba2a6e467005b3bf332a04444564e69b92bc23dc
|
|
Scenario Analysis doc - multisite Scenario
JIRA:HA-18
Change-Id: I74b51e91fcfed3a689945e8a86f6f5648aac00ba
|
|
Scenario Analysis doc - general issues for VNF HA
JIRA:HA 15
Change-Id: I8dff0d1120ac4f5046f678667204cb6bc80d761e
|
|
Scenario Analysis doc - multisite Scenario
JIRA:HA-18
Change-Id: I6fb47f4bf4441cf3e06955548f2f5f3da5cf8b5a
Signed-off-by:fuqiao
|
|
|
|
Fixed review comments from patch set 1
Patch set2: upload a wrong version of doc
Patch set4: change file name to Section_5_VIM_HA.rst and fix comments
Patch set5: delete all the endline blanks
Patch set6: update according to the comments
Patch set7: add the ability to configure HA functions
Patch set8: add some small changes in comments for patch set 3
Closes-bug: JIRA: HA-8
Signed-off-by: zhang.jun3g@zte.com.cn
Change-Id: Ie8f12ca141448087affc66d4a6a3594a21125f0d
|
|
|
|
|
|
Add use basic cases
Modify based on comments. Size figures
Remove slide figures
Add updated figures
Apply modifications suggested by Ian
Apply Ian's suggestions and other small fixes
Add conclusion and fix spelling
JIRA: HA-11 HA-14
Change-Id: I04331a4fd25d95a69ac086c962399ce6c49c8c33
Signed-off-by: Maria Toeroe <Maria.Toeroe@ericsson.com>
|
|
JIRA:HA-7
Change-Id: I1629220d9c7095f91b37e3d3af6354bf6b921d0a
Signed-off-by: fuqiao@chinamobile.com
|
|
|
|
|
|
This code will be pushed to each project creating a docs/ directory
This servers as an example and template for you (the developers) to create
your own project documentation
Change-Id: Icd33fb5a155121e6a0376f3905e662fbbc6af8d7
JIRA:RELENG-15
Signed-off-by: Aric Gardner <agardner@linuxfoundation.org>
|
|
Captured from eterpad and edited to factor in some of the review comments. Formatted for .rst.
Addressed feedback to patch set 1/2/3/4/5/6/7.
Fixes: JIRA - HA-6
Signed-off-by: ian.jolliffe@windriver.com
Change-Id: I778f2cce7fb8c1691957ad93cb97b159ccb73496
|
|
|
|
Add line breaks and remove trailing white space
Remove some more spaces
Remove comments from etherpad
Fix table and create a reference to the ETSI NFV-REL document
Clarifications in section 6.1.2.1 and some formatting change
Fix table and references and modify requirements in 6.1.1.
JIRA: HA-2
Change-Id: I4ac99548d5e9e729ad150a3ad4166ae84f8a9b8e
Signed-off-by: Maria Toeroe <Maria.Toeroe@ericsson.com>
|
|
|
|
Converted the etherpad to .rst format. Fixed formating.
Addressed feedback to patch set 2,3,4,5.
Closes-Bug: JIRA: HA-3
Signed-off-by: ian.jolliffe@windriver.com
Change-Id: I16ab73faeee8e999cfed85b7f8b3c5ddb3d1f7d7
|
|
Captured from Project Etherpad for review
https://etherpad.opnfv.org/p/High_Availabiltiy_Requirement_for_OPNFV
Fixed formating and carriage returns
Fixed whitespace issues
Fixed review comments from patch set 3&4
Closes-bug: JIRA: HA-5
Signed-off-by: ian.jolliffe@windriver.com
Change-Id: Iad097de9216e584d47609a89eed85f02f4426ce5
|
|
Change-Id: I1acfc3e444e9fccba7473e166c29c3955303aec8
JIRA: OCTO-13
Signed-off-by: Aric Gardner <agardner@linuxfoundation.org>
|
|
Change-Id: I3fc7df6fce2ed8e3d85a527811328e78b1de41e4
Signed-off-by: Aric Gardner <agardner@linuxfoundation.org>
|
|
Change-Id: Iba825e5003b7122fb3096a0498df6114c870df77
Signed-off-by: Aric Gardner <agardner@linuxfoundation.org>
|
|
https://wiki.opendaylight.org/view/Git-review_Workflow
Change-Id: Ib5923dc4bd51b895abf98a83ee3d2cb30bc6aa7b
Signed-off-by: Aric Gardner <agardner@linuxfoundation.org>
|
|
|