aboutsummaryrefslogtreecommitdiffstats
path: root/docs/release/release-notes/auto-project-activities.png
AgeCommit message (Collapse)AuthorFilesLines
2018-06-28R6.2 updates for Auto Release Notes and Configuration GuideGerard Damm1-0/+0
JIRA: AUTO-41 Several updates in Release Notes and Configuration Guide, to capture changes and progress since R6.1. Included tickets 35,37,40, since they can still be done for 6.2. Patch 2: made updates based on comments (note: need to close by 6/28) Patch 3: minor edits, will merge today Patch 4: removed Jira tickets 35, 37, 40 from Auto release 6.2 Change-Id: I7547a9ea9b807c28513ce4e995d53a9f32223eb1 Signed-off-by: Gerard Damm <gerard.damm@wipro.com> (cherry picked from commit d2a98b6fba905cd3de79c0b1c35021423b9dda9f)
2018-04-26Release Notes April 12th update, for Fraser MS9Gerard Damm1-0/+0
JIRA: AUTO-26 added references to newly closed JIRA tickets, with clarified text added figure with Auto project activities added references other minor updates Change-Id: Ibf794a2fe7272a44a139a6192fa6c77bd95d3d1f Signed-off-by: Gerard Damm <gerard.damm@wipro.com> (cherry picked from commit 04e02a25d3b4398401d948bacadf9bafcba760f9)