2016-09-27Merge "Disable openstack-cinder-volume in step1 and reenable it in step2"Jenkins1-0/+3
2016-09-27Merge "A few major-upgrade issues"Jenkins1-2/+2
2016-09-27Merge "Start mongod before calling ceilometer-dbsync"Jenkins1-0/+7
2016-09-25A few major-upgrade issuesMichele Baldessari1-2/+2
This commit does the following: 1. We now explicitly disable/stop and then remove the resources that are moving to systemd. We do this because we want to make sure they are all stopped before doing a yum upgrade, which otherwise would take ages due to rabbitmq and galera being down. It is best if we do this via pcs while we do the HA Full -> HA NG migration because it is simpler to make sure all the services are stopped at that stage. For extra safety we can still do a check by hand. By doing it via pacemaker we have the guarantee that all the migrated services are down already when we stop the cluster (which happens to be a syncronization point between all controller nodes). That way we can be certain that they are all down on all nodes before starting the yum upgrade process. 2. We actually need to start the systemd services in major_upgrade_controller_pacemaker_2.sh and not stop them. 3. We need to use the proper bash variable name 4. Use is_bootstrap_node everywhere to make the code more consistent Change-Id: Ic565c781b80357bed9483df45a4a94ec0423487c Closes-Bug: #1627490
2016-09-25Disable openstack-cinder-volume in step1 and reenable it in step2Michele Baldessari1-0/+3
Currently we do not disable openstack-cinder-volume during our major-upgrade-pacemaker step. This leads to the following scenario. In major_upgrade_controller_pacemaker_2.sh we do: start_or_enable_service galera check_resource galera started 600 .... if [[ -n $(is_bootstrap_node) ]]; then ... cinder-manage db sync ... What happens here is that since openstack-cinder-volume was never disabled it will already be started by pacemaker before we call cinder-manage and this will give us the following errors during the start: 06:05:21.861 19482 ERROR cinder.cmd.volume DBError: (pymysql.err.InternalError) (1054, u"Unknown column 'services.cluster_name' in 'field list'") Change-Id: I01b2daf956c30b9a4985ea62cbf4c941ec66dcdf Closes-Bug: #1627470
2016-09-25Start mongod before calling ceilometer-dbsyncMichele Baldessari1-0/+7
Currently we in major_upgrade_controller_pacemaker_2.sh we are calling ceilometer-dbsync before mongod is actually started (only galera is started at this point). This will make the dbsync hang indefinitely until the heat stack times out. Now this approach should be okay, but do note that when we start mongod via systemctl we are not guaranteed that it will be up on all nodes before we call ceilometer-dbsync. This *should* be okay because ceilometer-dbsync keeps retrying and eventually one of the nodes will be available. A completely clean fix here would be to add another step in heat to have the guarantee that all mongo servers are up and running before the dbsync call. Change-Id: I10c960b1e0efdeb1e55d77c25aebf1e3e67f17ca Closes-Bug: #1627453
2016-09-25Reinstantiate parts of code that were accidentally removedMichele Baldessari1-0/+1
With commit fb25385d34e604d2f670cebe3e03fd57c14fa6be "Rework the pacemaker_common_functions for M..N upgrades" we accidentally removed some lines that fixed M/N upgrade issues. Namely: extraconfig/tasks/major_upgrade_controller_pacemaker_1.sh -# https://bugzilla.redhat.com/show_bug.cgi?id=1284047 -# Change-Id: Ib3f6c12ff5471e1f017f28b16b1e6496a4a4b435 -crudini --set /etc/ceilometer/ceilometer.conf DEFAULT rpc_backend rabbit -# https://bugzilla.redhat.com/show_bug.cgi?id=1284058 -# Ifd1861e3df46fad0e44ff9b5cbd58711bbc87c97 Swift Ceilometer middleware no longer exists -crudini --set /etc/swift/proxy-server.conf pipeline:main pipeline "catch_errors healthcheck cache ratelimit tempurl formpost authtoken keystone staticweb proxy-logging proxy-server" -# LP: 1615035, required only for M/N upgrade. -crudini --set /etc/nova/nova.conf DEFAULT scheduler_host_manager host_manager extraconfig/tasks/major_upgrade_controller_pacemaker_2.sh nova-manage db sync - nova-manage api_db sync This patch simply puts that code back without reverting the whole commit that broke things, because that is needed. Closes-Bug: #1627448 Change-Id: I89124ead8928ff33e6b6907a7c2178169e91f4e6
2016-09-19Add a function to upgrade from full HA to NG HAMichele Baldessari1-6/+8
This is the initial work to have a function that migrates a full HA architecture as deployed in Mitaka to the HA architecture as deployed in Newton where only a few resources are managed by pacemaker. The sequence is the following: 1) We remove the desired services from pacemaker's control. The services at this point are still running normally via the systemd service as invoked by pacemaker 2) We do a "systemctl stop <service>" on all controllers for all the services that were removed from pacemaker's control. We do this to make sure that during the yum upgrade, the %post sections that call "systemctl try-restart" do not take ages, because at this point during the upgrade rabbit is down. The only exceptions are "openstack-core" and "delay" which are dummy pacemaker resources that do not exist on the system 3) We do a "systemctl start <service>" on all nodes for all the services mentioned above. We should probably merge this patch only when newton has branched as it is very specific to the M/N upgrade. Closes-Bug: 1617520 Change-Id: I4c409ce58c1a57b6e0decc3cf168b62698b32e39
2016-09-17Rework the pacemaker_common_functions for M..N upgradesmarios1-20/+21
For N we cannot assume services are managed by pacemaker. This adds functions to check if a service is systemd or pcmk managed and start/stops it accordingly. For pcmk, only stop/disable on bootstrap node for example, whereas systemd should stop/start on all controllers. There is also an equivalent change to the check_resource which has been reworked to allow both pcmk and systemd. Implements: blueprint overcloud-upgrades-workflow-mitaka-to-newton Change-Id: Ic8252736781dc906b3aef8fc756eb8b2f3bb1f02
2016-08-24M/N upgrade fail to restart nova-scheduler.Sofer Athlan-Guyot1-0/+1
The nova api db need to be synchronized as well. Change-Id: I2628b24ff1153c84cbf388455666ae42570cb10f Closes-Bug: 1615042
2016-05-02Disable VIPs before stopping cluster during version upgradeIan Pilcher1-0/+5
If "pcs cluster stop --all" is executed on a controller that happens to have a VIP on the internal network, pcs may use the VIP as the source address for communication with another cluster node. When pacemaker is stopped this VIP goes away, and pcs never receives a response from the other node. This causes pcs to hang indefinitely; eventually the upgrade times out and fails. Disabling the VIPs before stopping the cluster avoids this situation. Change-Id: I6bc59120211af28456018640033ce3763c373bbb Closes-Bug: 1577570
2016-04-11Update .sh references from openstack-keystone to openstack-coreGiulio Fidente1-4/+2
The update and upgrade shell scripts were still referencing the old openstack-keystone service which got removed with Ie26908ac9bfc0b84b6b65ae3bda711236b03d9d4 Also removes kilo and liberty specific workarounds and config changes. Change-Id: Icc80904908ee3558930d4639a21812f14b2fd12e
2016-03-02Moves the swift start/stop into the common_functions.sh filemarios1-5/+1
Since swift isn't managed by pacemaker we need to manually (systemctl) stop and start the swift services. This moves the duplicate blocks for start/stop into a common function (we already include that pacemaker_common_functions.sh here so may as well) Change-Id: Ic4f23212594c1bf9edc39143bf60c7f6d648fd1d
2016-02-23Introduce update/upgrade workflowJiri Stransky1-0/+71
Change-Id: I7226070aa87416e79f25625647f8e3076c9e2c9a