diff options
author | Sofer Athlan-Guyot <sathlang@redhat.com> | 2017-04-06 16:55:08 +0200 |
---|---|---|
committer | Sofer Athlan-Guyot <sathlang@redhat.com> | 2017-04-07 17:43:53 +0200 |
commit | 0ea21f51a8128e536404ffd87f741443c9287593 (patch) | |
tree | bee532ca657e973b52e7737460d37d6888e6c9f4 /docker/services/nova-conductor.yaml | |
parent | 161b2b4427f7db0cf65d209a3f63804de9724107 (diff) |
Timeout early on pcs cluster status check0 during upgrade.
There is a windows for the pcs cluster status to hang forever[1]. We
add a timeout during check0 to avoid this situation. 2 minutes should
be more than enought to get all the pcsd nodes to reply.
[1] https://bugzilla.redhat.com/show_bug.cgi?id=1292858
Closes-Bug: #1680477
Change-Id: Icb3dc76e031a3d4f26294f37d169f2f61d30973e
Diffstat (limited to 'docker/services/nova-conductor.yaml')
0 files changed, 0 insertions, 0 deletions