.. This work is licensed under a Creative Commons Attribution 4.0 International License. .. http://creativecommons.org/licenses/by/4.0 .. (c) Ericsson AB .. _dovetail-system_preparation_guide: ============================================================ Compliance and Verification program system preparation guide ============================================================ .. toctree:: :maxdepth: 2 Version history =============== +------------+----------+------------------+----------------------------------+ | **Date** | **Ver.** | **Author** | **Comment** | | | | | | +------------+----------+------------------+----------------------------------+ | 2017-04-25 | 0.0.1 | Chris Price | Draft version | | | | | | +------------+----------+------------------+----------------------------------+ Introduction ============ This system preparation guide provides a detailed outline of the needed system prerequisites and expectations for running OPNFV evaluation testing. Test planning and preparation ============================= https://jira.opnfv.org/browse/DOVETAIL-384 Give an outline of the planning phase. -------------- Pre-requisites -------------- Describe what needs to be in place before starting. Required Infrastructure, connectivity needs, LF & CVP accounts and any additional security or peripheral needs. Use sub-chapters for instance for any accounts etc that need to be created. ------------------------------------------- Preparing the virtualisation infrastructure ------------------------------------------- Briefly state what will be tested as an intro, then outline the required system state to be achieved prior to running the tests. Preparing the test staging host system -------------------------------------- https://jira.opnfv.org/browse/DOVETAIL-385 What is required from the system running the CVP test suites? Required network configuration ------------------------------- https://jira.opnfv.org/browse/DOVETAIL-386 VLAN configurations required for NFV deployments. Non-VLAN configurations if needed. Preparing your system for CVP testing ------------------------------------- https://jira.opnfv.org/browse/DOVETAIL-387 Describe how to realise the "Pharos ready state" and the "Software ready state" in this section.