From 6c99abc7aa0d101388bb904a231ceccda6ace4d9 Mon Sep 17 00:00:00 2001 From: Georg Kunz Date: Fri, 22 Dec 2017 14:48:10 +0100 Subject: Changing CVP to OVP in the documentation Due to the name change from 'CVP' to 'OVP', the documentation has to be updated. Change-Id: Id934e8fc07f60802f7aa6b3d295d268c4c9b71f8 Signed-off-by: Georg Kunz (cherry picked from commit 8f16dae9dae6d13bc6f5934bae5d26d420efd892) --- docs/testing/user/index.rst | 71 --------------------------------------------- 1 file changed, 71 deletions(-) delete mode 100644 docs/testing/user/index.rst (limited to 'docs/testing/user/index.rst') diff --git a/docs/testing/user/index.rst b/docs/testing/user/index.rst deleted file mode 100644 index 120aba45..00000000 --- a/docs/testing/user/index.rst +++ /dev/null @@ -1,71 +0,0 @@ -.. This work is licensed under a Creative Commons Attribution 4.0 International License. -.. http://creativecommons.org/licenses/by/4.0 -.. (c) Ericsson AB - -====================================================== -Compliance and Verification program user documentation -====================================================== - -.. toctree:: - :maxdepth: 2 - -Version history -=============== - -+------------+----------+------------------+----------------------------------+ -| **Date** | **Ver.** | **Author** | **Comment** | -| | | | | -+------------+----------+------------------+----------------------------------+ -| 2017-03-15 | 0.0.1 | Chris Price | Draft version | -| | | | | -+------------+----------+------------------+----------------------------------+ - - -Introduction -============ - -This document provides all relevant user documentation for executing the OPNFV -compliance and certification program (CVP). The CVP provides mechanisms for evaluating -NFV infrastructures to establish their alignment with the target architectures, behaviours -and functions defined by the OPNFV community. - -Compliance and Verification Program guidelines -============================================== - -The CVP provides publicly available mechanisms for evaluating compliance to OPNFV concepts, -behaviours and architectures. The CVP, through the Compliance and Certification -committee, is responsible for evaluating the results of any evaluations and providing -access to any associated OPNFV branding. Details of the CVP are described in the `CVP Document.`_ - -"Add the final CVP doc URL in plain text here" - -Compliance and Verification program test specification -====================================================== - -The `test specification`_ provides an outline of the prerequisites, methods, tools -& areas that are applicable to the CVP test process. The `test specification`_ is intended -to give a use a comprehensive overview of what is expected of engineer prior to running -the NFV platform evaluation suite, what tools and processes will be used during the -evaluation and a guide as to how the results of the tests will be interpreted. It is advised -that all practitioners of the CVP read the `test specification`_ prior to beginning -the process of evaluation. - -"Add the final test spec URL in plain text here" - -Compliance and Verification program Test Plan -============================================= - -The test spec will outline the processes & areas and the test case descriptions included. -This document will in addition outline how to modularise the areas to be executed, how to -run each area and when the testing process begins and ends. - -Compliance and Verification program Test results -================================================ - -To be added once our test result reporting system and processes are defined. - -References -========== - -.. _`CVP Document.`: https://opnfv.org -.. _`test specification`: https://opnfv.org -- cgit 1.2.3-korg