Age | Commit message (Collapse) | Author | Files | Lines |
|
JIRA: DOVETAIL-701
Change-Id: I940bdd16762dd36ee338f41e5b2aab352c70600f
Signed-off-by: dimitris.tsiolakis <dmts@intracom-telecom.com>
(cherry picked from commit 0727b542015f7f3718eda435396d34aec5ac1c80)
|
|
The reviewer guidelines will be created per release, where the
CVP/Dovetail releases are aligned to OPNFV releases. The guidelines
outlined in this initial document are for the Danube release.
Updated reviewer guidelines
- Updated to account for issue where mandatory total always shows 215
in current version of web portal; removed one diagram and amended another
- First section title change and wording for test area results
- Removed white space
- Added SUT info section and diagrams
- Modified reference to cvp.opnfv.org with verified.opnfv.org
- Modified reference to cvp@opnfv.org with verified@opnfv.org
- Modified diagram filenames to reflect program name change
- Changed CVP references to OVP and Danube to 2018.01
- Remove TODO for granting marks and escalation - this info is in other docs
Change-Id: I01fc568ce6713d3c60daf339a2630e56e8dbcfcb
Signed-off-by: Eddie Arrage <eddie.arrage@huawei.com>
|
|
This is minor patch which updates the documentation in the dovetail
repo in order to test the toolchain integration in opnfvdocs.
Change-Id: Id91c57d1a38cf02d8ed4653bc9eddb7081f025e7
Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>
|
|
This document shall describe guidelines and evaluation criteria for
reviewers on how to handle the review process of results.
DOVETAIL-408
Change-Id: I78e669544bc172b74f94443176a48082a4c28a2f
Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>
|