Age | Commit message (Collapse) | Author | Files | Lines |
|
The official name of the next release is going to be 2018.09.
We need to rename all occurrences of 2018.08 in the code base,
the documentation, and the web portal.
JIRA: DOVETAIL-740
Change-Id: Ie0e532d6671b7590454e9afd960a2934f313a022
Signed-off-by: xudan <xudan16@huawei.com>
(cherry picked from commit b65bbbc31c1a36e9981761712aea8ff17c8bc9de)
|
|
JIRA: DOVETAIL-701
Change-Id: I940bdd16762dd36ee338f41e5b2aab352c70600f
Signed-off-by: dimitris.tsiolakis <dmts@intracom-telecom.com>
(cherry picked from commit 0727b542015f7f3718eda435396d34aec5ac1c80)
|
|
The reviewer guidelines will be created per release, where the
CVP/Dovetail releases are aligned to OPNFV releases. The guidelines
outlined in this initial document are for the Danube release.
Updated reviewer guidelines
- Updated to account for issue where mandatory total always shows 215
in current version of web portal; removed one diagram and amended another
- First section title change and wording for test area results
- Removed white space
- Added SUT info section and diagrams
- Modified reference to cvp.opnfv.org with verified.opnfv.org
- Modified reference to cvp@opnfv.org with verified@opnfv.org
- Modified diagram filenames to reflect program name change
- Changed CVP references to OVP and Danube to 2018.01
- Remove TODO for granting marks and escalation - this info is in other docs
Change-Id: I01fc568ce6713d3c60daf339a2630e56e8dbcfcb
Signed-off-by: Eddie Arrage <eddie.arrage@huawei.com>
|
|
This is minor patch which updates the documentation in the dovetail
repo in order to test the toolchain integration in opnfvdocs.
Change-Id: Id91c57d1a38cf02d8ed4653bc9eddb7081f025e7
Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>
|
|
This document shall describe guidelines and evaluation criteria for
reviewers on how to handle the review process of results.
DOVETAIL-408
Change-Id: I78e669544bc172b74f94443176a48082a4c28a2f
Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>
|