summaryrefslogtreecommitdiffstats
path: root/docs/testing/user/reviewerguide/index.rst
AgeCommit message (Collapse)AuthorFilesLines
2018-09-19Reviewers Guide document for fraser release.dimitris.tsiolakis1-4/+4
Images have been updated to depict the latest changes in Dovetail Web portal. Change-Id: I4dc928141856fab34670272fcc465bea3f6156db Signed-off-by: dimitris.tsiolakis <dmts@intracom-telecom.com>
2018-09-17Adapting local docs build and remove build warningsGeorg Kunz1-1/+1
The OPNFV docs project will remove its submodules and enable local docs builds. This patch prepares the Dovetail repo according to the official transition guide: https://docs.opnfv.org/en/latest/how-to-use-docs/local-build-transition.html This patch also applies syntactical changes which eliminate the sphinx doc build warnings. Change-Id: Ief8fd2d1c3e39b232d214a9ab392879ee4a492c8 Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>
2018-09-13Update code base and docs to 2018.09xudan1-2/+1
The official name of the next release is going to be 2018.09. We need to rename all occurrences of 2018.08 in the code base, the documentation, and the web portal. JIRA: DOVETAIL-740 Change-Id: Ie0e532d6671b7590454e9afd960a2934f313a022 Signed-off-by: xudan <xudan16@huawei.com>
2018-08-31Reviewer guide update for OVP 2018.08 releasedimitris.tsiolakis1-113/+126
JIRA: DOVETAIL-701 Change-Id: I940bdd16762dd36ee338f41e5b2aab352c70600f Signed-off-by: dimitris.tsiolakis <dmts@intracom-telecom.com>
2018-01-18Transfer Danube reviewer guidelines from wikiEddie Arrage1-8/+190
The reviewer guidelines will be created per release, where the CVP/Dovetail releases are aligned to OPNFV releases. The guidelines outlined in this initial document are for the Danube release. Updated reviewer guidelines - Updated to account for issue where mandatory total always shows 215 in current version of web portal; removed one diagram and amended another - First section title change and wording for test area results - Removed white space - Added SUT info section and diagrams - Modified reference to cvp.opnfv.org with verified.opnfv.org - Modified reference to cvp@opnfv.org with verified@opnfv.org - Modified diagram filenames to reflect program name change - Changed CVP references to OVP and Danube to 2018.01 - Remove TODO for granting marks and escalation - this info is in other docs Change-Id: I01fc568ce6713d3c60daf339a2630e56e8dbcfcb Signed-off-by: Eddie Arrage <eddie.arrage@huawei.com>
2017-11-03Minor docs change to test docs integrationGeorg Kunz1-11/+0
This is minor patch which updates the documentation in the dovetail repo in order to test the toolchain integration in opnfvdocs. Change-Id: Id91c57d1a38cf02d8ed4653bc9eddb7081f025e7 Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>
2017-04-27Adding a stub document for a CVP reviewer guideGeorg Kunz1-0/+35
This document shall describe guidelines and evaluation criteria for reviewers on how to handle the review process of results. DOVETAIL-408 Change-Id: I78e669544bc172b74f94443176a48082a4c28a2f Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>