summaryrefslogtreecommitdiffstats
path: root/docs/testing/developer/testscope
AgeCommit message (Collapse)AuthorFilesLines
2018-01-24Remove a sub test case under dovetail.tempest.tc004Eddie Arrage1-118/+23
- Fixed vping, ha, sdnvpn test case names to match test specs - Removed aliases from VIM operations and matched test case name changes in patch https://gerrit.opnfv.org/gerrit/#/c/47691/4 - CVP to OVP name change - A test case was removed from tempest tc004 because of the Tempest version from 15 to 14. A reference to it was still in this doc. Change-Id: If2e07e15b48ae6bca5ac0e262aead784cd67cd0f Signed-off-by: Eddie Arrage <eddie.arrage@huawei.com>
2018-01-15Changing CVP to OVP in the documentationGeorg Kunz1-2/+2
Due to the name change from 'CVP' to 'OVP', the documentation has to be updated. Change-Id: Id934e8fc07f60802f7aa6b3d295d268c4c9b71f8 Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>
2017-10-23Fixing references and layout in the docsGeorg Kunz1-0/+2
This patchset introduces labels for documentation-internal references and replaces footnote-style citations with inline hyperlinks. Additional minor changes for a nicer rendering of bullet lists. JIRA: DOVETAIL-521 Change-Id: Ic847fc05d546d673dadc7b8efee86fcb688133f5 Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>
2017-09-07Merge "Add test area 'forwarding packets through virtual networks in data path'"hongbo tian1-0/+6
2017-09-07Merge "Test case specification for VIM Network"hongbo tian1-1/+19
2017-09-06Add test area 'forwarding packets through virtual networks in data path'xudan1-0/+6
JIRA: DOVETAIL-473 According to Dovetail addendum doc, add one test area about basic cloud capability 'forwarding packets through virtual networks in data path'. Add the test specification about this test area. Change-Id: I26416ecca6b89a94cf48ba0f55308df0fa6e1677 Signed-off-by: xudan <xudan16@huawei.com>
2017-09-05Add test area 'simple virtual machine resource scheduling on multiple nodes'xudan1-0/+11
JIRA: DOVETAIL-473 According to Dovetail addendum doc, add one test area about basic cloud capability 'simple virtual machine resource scheduling on multiple nodes'. Add the test specification about this test area. Change-Id: I7a5ff426442424dbc364a68296facb0bac6401ca Signed-off-by: xudan <xudan16@huawei.com>
2017-09-06Merge "Add test area 'correct behavior after common virtual machine life ↵hongbo tian1-0/+18
cycles events'"
2017-09-06Merge "Test case specification for VIM Image"hongbo tian1-0/+11
2017-09-05Add test area 'correct behavior after common virtual machine life cycles events'xudan1-0/+18
JIRA: DOVETAIL-473 According to Dovetail addendum doc, add one test area about basic cloud capability 'correct behavior after common virtual machine life cycles events'. Add the test specification about this test area. Change-Id: I051b3c5b501ed833a613ea6a6601125c4fa80c3e Signed-off-by: xudan <xudan16@huawei.com>
2017-09-05Merge "Add test area 'dynamic network runtime operations'"hongbo tian1-0/+9
2017-09-04Merge "Test case specification for VIM Compute"hongbo tian1-0/+2
2017-09-01Merge "Test case specification for VIM Volume"hongbo tian1-0/+63
2017-09-01Add test area 'dynamic network runtime operations'xudan1-0/+9
JIRA: DOVETAIL-473 According to Dovetail addendum doc, add one test area about basic cloud capability 'dynamic network runtime operations through the life of a VNF'. Add the test specification about this test area. Change-Id: I59706bc4a5765cf779a03fc3c493e5a8d184c1dc Signed-off-by: xudan <xudan16@huawei.com>
2017-08-31Test case specification for VIM Computexudan1-0/+2
1. Add the alias VIM Compute test cases into testscope. 2. Add test case specification for VIM Compute. Change-Id: Icca09a58221511f607e43eb1d0415d9de4e452eb Signed-off-by: xudan <xudan16@huawei.com>
2017-08-18Test case specification for VIM Volumexudan1-0/+63
1. Add the alias VIM Volume test cases into testscope. 2. Add test case specification for VIM Volume. Change-Id: I715a69aad380466659365cc554351efb4d6eb053 Signed-off-by: xudan <xudan16@huawei.com>
2017-08-16Test case specification for VIM Networkxudan1-1/+19
1. Add the alias VIM Network test cases into testscope. 2. Add test case specification for VIM Network. Change-Id: I133ad13b1f926e0093d92a9a39d88947648122ea Signed-off-by: xudan <xudan16@huawei.com>
2017-08-14Add test area 'filtering packets based on security rules and port security'xudan1-0/+11
JIRA: DOVETAIL-473 According to Dovetail addendum doc, add one test area about basic cloud capability 'filtering packets based on security rules and port security in data path'. Add the test specification about this test area. Change-Id: I814204f16b79bc06d9bfb54d5a90692d8b8c7bfa Signed-off-by: xudan <xudan16@huawei.com>
2017-08-10Test case specification for VIM Imagehongbotian1-0/+11
1. Adding the alias VIM image test cases into testscope. 2. Adding test case specification for VIM Image. Change-Id: Ifa7aa5ddea22d2862ee5d8ad465523d450a78fde Signed-off-by: hongbotian <hongbo.tianhongbo@huawei.com>
2017-07-28WIP: Test case description for vping test casesGeorg Kunz1-0/+8
Adding test case descriptions for both vping test cases implemented in Functest. Test case 1 makes use of the config drive mechanism of Nova to pass a test script. Test case 2 uses SSH to transfer and execute a script on one VM. Change-Id: Ic8be6ad4dfd4b0e7661064506b0ae92db2fc1463 Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>
2017-06-24Merge "HA testcases"hongbo tian1-0/+17
2017-06-22HA testcasesfuqiao1-0/+17
Modify HA testcases.rst file to include detail discribtion of the 8 testcases. Rename the original rst file into HA testcases outline.rst. Please review and see if you need two of these file, or you prefer a single one, or maybe merge these two. as discussed,propose 8 HA testcases for mandatory test cases. JIRA: Change-Id: Ie6cd5a68897bb0208932d2e1fec65cc59bfa25b4 Signed-off-by: fuqiao@chinamobile.com
2017-06-09IPv6 Test CasesBin Hu1-1/+134
Change-Id: Icdb2786076aa6a263449eca5db4a07d14f1e2adf Signed-off-by: Bin Hu <bh526r@att.com>
2017-06-05Adding SDNVPN test cases to the Optional Test areas of the CVP.Georg Kunz1-207/+246
Included the tests for SDNVPN in the docetail scope document Performed spell checking of the committed test area document and included the section around test suite structure. This patch should be reviewed and approved by the SDNVPN team prior to being merged. Change-Id: Ia2f9a1bddb02b9191da1239a73f121dce6687af1 Co-Authored-By: Georg Kunz <georg.kunz@ericsson.com> Co-Authored-By: ChristopherPrice <christopher.price@ericsson.com> Signed-off-by: ChristopherPrice <christopher.price@ericsson.com> Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>
2017-05-03Drafting the first "refstack" version of the test scope document.Georg Kunz1-0/+363
To be aligned with the committers and agreed as the "foundation" list of test scope for moving forward with DoveTail test selection. Requires a majority of committer approvals prior to merging. Change-Id: I5fb091d2190a183d24ba9e766d19aba9e6a7c094 Signed-off-by: ChristopherPrice <christopher.price@ericsson.com> Signed-off-by: Georg Kunz <georg.kunz@ericsson.com>